Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24BG0091 was awarded at 99.94% of its ABC. Across its 33 recorded contracts, JWU CONST AND SUPPLY was awarded at ≥99.5% of ABC 33 times (100.0%), versus 70.4% for flood-control contracts overall. It is possible that the contractor consistently bids just below the ABC to maximize their chances of winning while complying with procurement rules.

Public record entityConstruction of River Flood Control Project along Ganano River Bank, Barangay Sta. Maria (Sta. 0+000 - Sta. 0+468.30), Alicia, Isabela
LocationALICIA (ISABELA), ISABELA, Region IIContract 24BG0091
Amount₱96,441,752.6899.94% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of River Flood Control Project along Ganano River Bank, Barangay Sta. Maria (Sta. 0+000 - Sta. 0+468.30), Alicia, Isabela24BG0091100%May 13, 2025October 25, 2024—completedsumbong source

Start: June 24, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Isabela 3rd District Engineering Office",
  "ratio": 0.9993964371801193,
  "abcPhp": 96499996.49,
  "threshold": 0.995,
  "contractId": "24BG0091",
  "contractor": "JWU CONST AND SUPPLY",
  "contractCostPhp": 96441752.68
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate