Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23BG0012 and 24BG0093 have near-identical descriptions at the same coordinates (funding years 2023, 2024; ₱24.13M, ₱48.75M). Worth checking whether they cover the same works. The second project may simply be a continuation or next phase of the first, but the earlier contract does not specify a phase.

Public record entityConstruction of Cagayan River Flood Control Project, Barangay San Guillermo, Angadanan, Isabela
LocationANGADANAN (ISABELA), ISABELA, Region IIContract 23BG0012
Amount₱24,132,730.03 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Cagayan River Flood Control Project, Barangay San Guillermo, Angadanan, Isabela23BG0012Flood control100%October 1, 2023August 18, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 20, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Identical coordinates shared by multiple contracts

{
  "contractId": "23BG0012",
  "coordinates": {
    "lat": 16.804735,
    "lon": 121.772804
  },
  "otherContracts": [
    "24BG0093"
  ]
}

Possible Innocent Explanations

  • Multi-component contracts sharing a single pin
  • GIS centroid placement

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaAngadananSan Guillermo
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Active fault26.3 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.