Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23BB0029 and 22BB0130 have near-identical descriptions about 126 m apart (funding years 2022, 2023; ₱49.00M, ₱49.40M). Worth checking whether they cover the same works. It is possible that the second project is a continuation or extension of the first, or covers an adjacent stretch of the river.

Public record entityConstruction of Flood Control Structure, Cagayan River, Tucalana, Lal-lo, Cagayan
LocationLAL-LO (CAGAYAN), CAGAYAN, Region IIContract 22BB0130
Amount₱49,398,023.35 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure, Cagayan River, Tucalana, Lal-lo, Cagayan22BB0130Flood control100%January 8, 2023May 28, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 1, 2022 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "22BB0130",
  "coordinates": {
    "lat": 18.183056,
    "lon": 121.65889
  },
  "municipality": "LAL-LO (CAGAYAN)",
  "distanceMeters": 126.16504989274667,
  "titleSimilarity": 0.9700598802395209
}

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanLal-LoTucalana
Storms whose wind field reached it
Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Active fault14.2 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.