Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24BG0069 was awarded at 99.99% of its ABC. Across its 33 recorded contracts, JWU CONST AND SUPPLY was awarded at ≥99.5% of ABC 33 times (100.0%), versus 70.4% for flood-control contracts overall. Contractors may consistently bid near the ABC to remain competitive without exceeding the legal limit.

Public record entityConstruction of River Flood Control Project along Ganano River Bank, Barangay San Antonio Upstream (Sta. 0+000 - Sta. 0+067.90, Sta. 0+070.90 - Sta. 0+465.60), Alicia, Isabela
LocationALICIA (ISABELA), ISABELA, Region IIContract 24BG0069
Amount₱96,489,676.0199.99% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of River Flood Control Project along Ganano River Bank, Barangay San Antonio Upstream (Sta. 0+000 - Sta. 0+067.90, Sta. 0+070.90 - Sta. 0+465.60), Alicia, Isabela24BG0069100%May 17, 2025August 5, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: June 24, 2024 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Isabela 3rd District Engineering Office",
  "ratio": 0.999893079578656,
  "abcPhp": 96499993.83,
  "threshold": 0.995,
  "contractId": "24BG0069",
  "contractor": "JWU CONST AND SUPPLY",
  "contractCostPhp": 96489676.01
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaAliciaSan Antonio
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Active fault21.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.