Bid-Ceiling Hugging
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 22BH0112 was awarded at 100.00% of its ABC. Across its 28 recorded contracts, V B MANUBAY CONST was awarded at ≥99.5% of ABC 28 times (100.0%), versus 70.4% for flood-control contracts overall. This may be due to consistently precise cost estimates or competitive bidding that matches the ABC.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Sta. Cruz Flood Control Project at Barangay Sta. Cruz, Echague, Isabela22BH0112Flood control | 100% | December 3, 2022 | November 10, 2022 | — | completedsumbong source |
Start: April 12, 2022 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Isabela 4th District Engineering Office",
"ratio": 1,
"abcPhp": 49000000,
"threshold": 0.995,
"contractId": "22BH0112",
"contractor": "V B MANUBAY CONST",
"contractCostPhp": 49000000
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate