Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22HO0005 was awarded at 100.00% of its ABC. Across its 88 recorded contracts, QM BUILDERS was awarded at ≥99.5% of ABC 84 times (95.5%), versus 70.4% for flood-control contracts overall. It is possible that the winning bid matched the ABC due to precise cost estimation or lack of competition.

Public record entityConstruction of Tapon-Tangil Seawall, Dumanjug, Cebu
LocationDUMANJUG (CEBU), CEBU, Region VIIContract 22HO0005
Amount₱48,998,325.59100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Tapon-Tangil Seawall, Dumanjug, Cebu22HO0005Flood control100%September 30, 2022September 26, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 10, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Cebu 7th District Engineering Office",
  "ratio": 1,
  "abcPhp": 48998325.59,
  "threshold": 0.995,
  "contractId": "22HO0005",
  "contractor": "QM BUILDERS",
  "contractCostPhp": 48998325.59
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Cite this record

Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Tapon-Tangil Seawall, Dumanjug, Cebu.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/f3c12b6e-3807-479e-be96-9cb58a6a1f67

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)CebuDumanjugTapon
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active fault12.5 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA1 (2.01-3 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.