Barangay
Eco
Eco, Mondragon, Northern Samar, Region VIII (Eastern Visayas). Rural. Population 2,999 (2024 POPCEN).
PSGC 0804813009 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Eco
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
2 records · ₱10,143,578.05
- Preventive Maintenance: Asphalt Overlay -Catarman - Laoang Rd - K0756+609 - K0757+006, Mondragon, Northern Samar₱9,173,579.73 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Repair/Improvement of Multipurpose Building, Barangay Eco, Mondragon, N. Samar₱969,998.32 · 2019 · medium confidence (project coordinates inside the barangay boundary)
How linked: 2 by project coordinates inside the barangay boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
Not yet linked to Eco itself. This shows the municipality figure for Mondragon.
2 records · ₱569,289,441.21
1 placed at Mondragon level itself; the rest in LGUs under it.
- Municipality of Mondragon, Northern Samar₱568,821,453.92 · high confidence (the LGU itself is the buyer)
- Barangay San Agustin, Mondragon, Northern Samar₱467,987.29 · high confidence (the LGU itself is the buyer)
How linked: 2 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Eco itself. This shows the province figure for Northern Samar.
21,081 records · ₱74,697,738,933.51
20,576 placed at Northern Samar level itself; the rest in LGUs under it.
- Northern Samar₱74,697,738,933.51 · 20,576 awards · high confidence (area of delivery is this province only)
- Biliran, Eastern Samar, Leyte, Northern Samar, Samar, Southern Leyte₱743,171,851.61 · 183 awards · low confidence (area of delivery lists several provinces)
- Eastern Samar, Leyte, Northern Samar, Samar, Southern Leyte₱378,221,917.42 · 160 awards · low confidence (area of delivery lists several provinces)
- Eastern Samar, Leyte, Northern Samar, Samar₱115,043,836.36 · 28 awards · low confidence (area of delivery lists several provinces)
- Eastern Samar, Northern Samar, Samar₱105,706,083.00 · 35 awards · low confidence (area of delivery lists several provinces)
- Biliran, Eastern Samar, Leyte, Northern Samar, Samar₱74,244,709.72 · 10 awards · low confidence (area of delivery lists several provinces)
How linked: 20,576 by area of delivery is this province only; 505 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
Not yet linked to Eco itself. This shows the municipality figure for Mondragon.
6 records · ₱16,500,000.00
1 placed at Mondragon level itself; the rest in LGUs under it.
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Construction of Health Station at Brgy. Cahicsan₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
- Construction of One Storey, One Classroom School Building at Brgy. San Antonio₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
- Construction of One Storey, One Classroom School Building at Brgy. San Isidro₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
- Construction of One-Storey, 1 - Classroom School Building at Brgy. Cagmanaba₱2,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Construction of Health Station at Brgy. Cagmanaba₱2,000,000.00 · 2022 · high confidence (location columns in the DBM release)
How linked: 6 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
Not yet linked to Eco itself. This shows the municipality figure for Mondragon.
40 records · ₱350,280,000.00
17 placed at Mondragon level itself; the rest in LGUs under it.
- Bugko Irrigation Project, Mondragon, Northern Samar₱70,000,000.00 · 2026 · high confidence (GAA line text names the place)
- Access Road to Nagkatulo Falls, Brgy. Makiwalo, Mondragon, Northern Samar₱40,000,000.00 · 2016 · medium confidence (GAA line text names the place)
- Concreting of Brgy. Chitongco to Sitio Pamiswakan Fmr , Mondragon, Northern Samar₱25,000,000.00 · 2024 · high confidence (GAA line text names the place)
- Construction of Flood Control Structure Along Bugko River, Barangay Bugko, Mondragon, Northern Samar₱20,000,000.00 · 2021 · medium confidence (GAA line text names the place)
- Construction of Multi-Purpose Building, Phase Ii, New Municipal Site, Mondragon, Northern Samar₱20,000,000.00 · 2025 · high confidence (GAA line text names the place)
- Rehabilitation of River Control, Barangay Makiwalo, Mondragon, Northern Samar₱20,000,000.00 · 2023 · medium confidence (GAA line text names the place)
How linked: 40 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
No published flags are linked to Eco itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, Mondragon.
- Contractor Concentration (Flood Control)Ezjones Const IncContractor: Ezjones Const Inc
- Cross-Source Mismatch (PhilGEPS vs DPWH)Construction of Mondragon Bantayan Old Road Shore Protection, Mondragon, Northern SamarContractor: C A Const and Supply
- Contractor Concentration (Flood Control)Cdu ConstContractor: Cdu Const
- Low-Graded DPWH Contractor Winning DepEd/DOH WorksAcm Konztrak Const and SupplyContractor: Acm Konztrak Const and Supply
Contractors on linked DPWH projects
All 2 contractors on DPWH projects linked to Eco and the LGUs under it. Click a column to sort.
| Vcd Const And Supply | 1 | ₱9,173,579.73 | 0 |
| Smu Const And Supply | 1 | ₱969,998.32 | 0 |
Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for Eco
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.