Aurora, Pudtol, Apayao, Cordillera Administrative Region (CAR). Rural. Population 422 (2024 POPCEN).

PSGC 1408106023 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Aurora

Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

10 records · ₱716,065,398.60

  1. Contract Package 3, Bridge Construction Replacement Program (Bcrp) I, Design and Build Bridges in Luzon₱537,989,252.60 · 2019 · medium confidence (project coordinates inside the barangay boundary)
  2. Oo 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads With Slips, Slope Collapse, and Landslide - Secondary Roads - Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0625 + 417.5 - K0626 + 012₱36,647,231.79 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  3. Construction and Maintenance of Bridge, Along National Roads - Replacement of Bridges (Temporary to Permanent) Sibayan Bridge (B04243lz) Along Kabugao-Pudtol-Luna-Cagayan Boundary Road₱26,530,384.78 · 2016 · medium confidence (project coordinates inside the barangay boundary)
  4. Oo1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads With Slips, Slope Collapse, and Landslide - Secondary Roads - Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0626 + 178 - K0626 + 288₱25,575,594.95 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  5. Construction of Standard 3-Storey 12-Cl, Pudtol Nhs, San Luis, Pudtol, Apayao₱21,525,798.05 · 2017 · medium confidence (project coordinates inside the barangay boundary)
  6. Package I: Asset Preservation Program-Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse and Landslide (Secondary Roads) Kabugao-Pudtol-Luna-Cagayan Road, 1.) K0623+446-K0624+112, 2.) K0626+(-072)-K0626+(-006), 3.) K0626+278-K0626+331(Rs),₱21,265,458.58 · 2019 · medium confidence (project coordinates inside the barangay boundary)

How linked: 10 by project coordinates inside the barangay boundary.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

Not yet linked to Aurora itself. This shows the municipality figure for Pudtol.

1 record · ₱8,435,475.45

  1. Municipality of Pudtol, Apayao₱8,435,475.45 · high confidence (the LGU itself is the buyer)

How linked: 1 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Aurora itself. This shows the province figure for Apayao.

20,198 records · ₱50,099,975,750.06

20,170 placed at Apayao level itself; the rest in LGUs under it.

  1. Apayao₱50,099,975,750.06 · 20,170 awards · high confidence (area of delivery is this province only)
  2. Agusan del Norte, Agusan del Sur, Aklan, Albay, Antique, Apayao₱86,831,144.90 · 3 awards · low confidence (area of delivery lists several provinces)
  3. Apayao, Aurora₱3,225,541.00 · 1 awards · low confidence (area of delivery lists several provinces)
  4. Apayao, Aurora, Basilan, Bataan, Batanes, Batangas, Benguet, Biliran, Bohol, Bukidnon₱2,856,492.00 · 1 awards · low confidence (area of delivery lists several provinces)
  5. Agusan del Norte, Agusan del Sur, Aklan, Albay, Antique, Apayao, Aurora, Basilan, Bataan, Batanes₱1,780,000.00 · 1 awards · low confidence (area of delivery lists several provinces)
  6. Antique, Apayao₱1,348,084.70 · 7 awards · low confidence (area of delivery lists several provinces)

How linked: 20,170 by area of delivery is this province only; 28 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

Not yet linked to Aurora itself. This shows the municipality figure for Pudtol.

3 records · ₱23,333,334.00

2 placed at Pudtol level itself; the rest in LGUs under it.

  1. Construction of Level Iii Water Supply System at Brgy. Swan₱13,333,334.00 · 2024 · high confidence (location columns in the DBM release)
  2. Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  3. Construction of Farm-to-Market Road in Barangay Malibang, Pudtol, Apayao, Cordillera Administrative Region (Car)₱5,000,000.00 · 2025 · high confidence (location columns in the DBM release)

How linked: 3 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

Not yet linked to Aurora itself. This shows the municipality figure for Pudtol.

62 records · ₱1,199,823,000.00

57 placed at Pudtol level itself; the rest in LGUs under it.

  1. Construction of Apayao-Abulug River Basin Flood Control Structure, Capannikian Section, Sta. 33+885 - Sta. 34+440 (L/S), Pudtol, Apayao₱150,000,000.00 · 2025 · high confidence (GAA line text names the place)
  2. Construction of Flood Control Structure, Apayao-Abulug River Basin, Swan Section, Sta. 36+566 - Sta. 37+121 (L/S), Pudtol, Apayao₱150,000,000.00 · 2025 · high confidence (GAA line text names the place)
  3. Construction of Apayao-Abulug River Basin Flood Control Structure, Capannikian Section, Sta. 34 + 440 - Sta. 35 + 060 (R/S), Pudtol, Apayao₱100,000,000.00 · 2023 · high confidence (GAA line text names the place)
  4. Construction of Sta. Maria-Upper Atok-Aurora Road - Tawit Bridge, Sta. 0+450, Pudtol, Apayao₱96,406,000.00 · 2026 · high confidence (GAA line text names the place)
  5. Pudtol-Flora Bridge Along Pudtol-Bagutong Road in Support of Furniture Handicrafts, Loom Weaving, Banana, Pineapple, Vegetables, and Root Crops, Corn and Rice, Sta. 1+868, Pudtol, Apayao₱96,406,000.00 · 2026 · high confidence (GAA line text names the place)
  6. Construction of Apayao-Abulug River Basin Flood Control Structure, Swan Section, Sta. 37 + 121 - Sta. 37 + 682 (R/S), Pudtol, Apayao₱85,000,000.00 · 2022 · high confidence (GAA line text names the place)

How linked: 62 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

  • Low-Graded DPWH Contractor Winning DepEd/DOH WorksAquila Const CoContractor: Aquila Const Co

See all 1 published flag

Contractors on linked DPWH projects

All 9 contractors on DPWH projects linked to Aurora and the LGUs under it. Click a column to sort.

Grace Const CORP1₱537,989,252.600
Isnag Builders2₱62,222,826.740
Pacific Star Erectors1₱26,530,384.780
E C T Const1₱21,525,798.050
Gka Engineering And Const1₱21,265,458.580
Aquila Const CO1₱18,681,988.151
W D Navarro Const CO1₱11,759,999.740
Vuc Highland Developers INC Formerly: Vuc Engineering1₱11,758,103.170
Ay-Ca Const Supply1₱4,331,586.790

Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share card: Aurora

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

QR codes for Aurora

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG