Roads18HF0076

UPGRADING (ASPHALT TO CONCRETE) OF BARILI-MANTAYUPAN RD-K0062+655-K0063+813

UPGRADING (ASPHALT TO CONCRETE) OF BARILI-MANTAYUPAN RD-K0062+655-K0063+813 is a DPWH-tracked public work in Cebu 3rd DEO, Region VII. Reported contract value: ₱32,639,952.60. Status: Reported complete (DPWH). Contractor on record: AR ADLAWAN CONST. Figures trace to dpwh.

Cebu 3rd DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVB-18-0019685 · ₱622,420 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18HF0076 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-03-17 → 2025-04-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱28,186,488 per km= 1.5x the Region VII median (n=123)

Contract cost ₱32,639,953 ÷ 1.158 km read from the DPWH title (“K0062+655-K0063+813”; K-post / station range length). National percentile: 54. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: UPGRADING (ASPHALT TO CONCRETE) OF BARILI-MANTAYUPAN RD-K0062+655-K0063+813

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Revetment (rubble concrete) at Langoyon River Basin, Sta. 1+100 - Sta. 1+372, Brgy. Langoyon, Tuburan, Cebu
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVB-18-0019685

₱622,420.00 · FY2018

Released to Mabini National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

76 projects · ₱2.6B total · 2 flags

4. Implementation

Contract Amount

₱32,639,952.60

Progress

Reported complete (DPWH)

Start Date

April 8, 2018

Target End

September 16, 2018

5. Audit