AR ADLAWAN CONST is listed as a company organization in Philippine public procurement records on this site, with 76 linked DPWH project(s) totaling about ₱2,583,380,911.21. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
AR ADLAWAN CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 76
- Total value
- ₱2,583,380,911.21
- Published flags
- 2
- Region
- Cebu 1st DEO · Region VII
Online presence
Google Maps: AR Adlawan Construction★ 4.5 (6 reviews)Google Maps, 2026-10-22
Countryside Village, 7R26+Q9V, Sandayong, Linao, Minglanilla, 6046 Cebu
Licensed officers (PCAB)
- Ma. Charlota C. Adlawan · Authorized Managing Officer (PCAB license 13108) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for AR ADLAWAN CONST — not an accusation or finding of wrongdoing.
Score: 88.40 / 100 · Projects in sample: 76 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 82.9/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 82.9
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 62
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 70
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 5
- Termination rate
Component score: 96.1/100 · Weight: 21%
- totalProjects
- 76
- componentScore
- 96.1
- terminatedProjects
- 1
- terminationRatePct
- 1.3
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 75
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.6/100 · Weight: 11%
- projects
- 76
- componentScore
- 99.6
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 76
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 72 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- ORGANIZATIONAL OUTCOME 1: ENDURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING OF PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD.) INCL. ROW, K0027+429-K0029+060, K0029+072-K0030+68018H00015 · ₱111,044,997.58 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-ROAD WIDENING OF PRIMARY ROADS, N. BACALSO AVE (CEBU SOUTH RD) INCL. ROW-K0031+350-K0033+K0033+74018H00032 · ₱101,188,814.56 · mapped
- Construction of Road Dike at Brgy. Ylaya - Brgy. Libo-o, Ronda, Cebu23HO0089 · ₱96,497,299.22 · mapped
- Construction of Road Dike at Brgy. Libo-o - Brgy. Ylaya, Ronda, Cebu23HO0090 · ₱96,497,197.73 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0051+480 - K0052+560, SIBONGA, CEBU23HE0074 · ₱93,865,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, CITY OF NAGA - SAN SAN FE25HD0097 · ₱91,655,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0019 + 000 - K0020 + 000, CITY OF25HD0007 · ₱81,050,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. LIBO-O (LEFT SIDE), RONDA, CEBU23HO0274 · ₱75,650,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - N BACALSO AVENUE (CEBU SOUTH RD) (S00285CB) K0015+251-K0016+75020HE0002 · ₱72,375,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL STRUCTURE AT BARANGAY YLAYA, RONDA,23HO0289 · ₱70,925,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS, N. BACALSO AVE (CEBU SOUTH RD), K0074+238 - K0076+15022HG0042 · ₱69,177,600.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO BAGONBON (LEFT SIDE), BARANGAY LIBOO,25HO0036 · ₱67,540,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - N. BACALSO AVE, (CEBU SOUTH RD) K0041+903 - K0043+54421HE0011 · ₱58,450,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF BRGY. MALOLOS-VETO-KANTABUGON ROAD LEADING TO HERMITS COVE, BOJO RIVER AND LUNHAW FARM RESORT, BRGY. MALOLOS, BARILI-BRGY. KANTABUGON, ALOGUINSAN, CEBU18HF0078 · ₱54,833,465.63 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM; REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD-TERTIARY ROADS ARGAO-MOALBOAL ROAD; K0059+000 K0060+000, K0069+186 K0070+259, K0058+8318HG0069 · ₱51,274,462.51 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASEET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0031+351 - K0033+201, SAN FERNANDO, CE23HE0104 · ₱49,215,965.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SIBONGA-DUMANJUG RD, K0063+000 - K0067+565, SIBONGA, CEBU22HE0009 · ₱48,412,000.00 · mapped
- NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - PRIMARY ROADS, NATALIO BACALSO AVENUE (CEBU SOUTH ROAD), CEBU SECTION 1: K009+-(570) TO K009+687.410; SECTION 2: K0015+496 TO K0015+830; SECTION 3: K0053+266 TO K0054+39117HE0087 · ₱48,333,543.01 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING PRIMARY ROADS; N.BACALSO AVE (CEBU SOUTH ROAD) - K0063+600 - K0065+64221HG0146 · ₱48,080,751.72 · mapped
- NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS - PRIMARY ROADS - OTHER PRIMARY ROADS - K0026+380-K0026+921, K0027+220-K0027+429 NATALIO BACALSO AVENUE (CEBU SOUTH ROAD), SAN FERNANDO, CEBU17HE0029 · ₱46,505,399.11 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) TERTIARY ROADS K0051=(-782)-K0051+000; K0054+778-K0055+17HE0020 · ₱45,241,278.62 · mapped
- CLUSTER U - 1) REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM HIGHWAY-4 (HDM-4) K0051+000-K0052+320 SIBONGA-DUMANJUG ROAD 2) IMPROVEMENT/CONSTRUCTION/UPGRADING/REHABILITATION15HE0167 · ₱42,155,632.32 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF LAMACAN RIVER FLOOD CONTROL STRUCTURE, SIBONGA, CEBU19HE0011 · ₱39,200,000.00 · mapped
- NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY ROAD, K0058+598-K0062+751, SIBONGA-DUMANJUG ROAD, SIBONGA, CEBU17HE0088 · ₱38,784,230.10 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY LIBO-O (LEFT SIDE) PACK24HO0156 · ₱38,529,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL RD SYSTEM - ASSET PRESERVATION - REHAB/RECONST/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY RDS - N BACALSO AVE (CEBU SOUTH RD) - K0027+429 - K0027+1007, K0027+1007 - K0028+008, K0028+008 - K0028+922HE0010 · ₱38,521,227.78 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF TULIC, ARGAO DRAINAGE SYSTEM, ARGAO, CEBU23HG0048 · ₱34,299,971.92 · mapped
- ORGANIZATIONAL OUTCOME 1; ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0052+159 - K0053+000, SIBONGA, CEBU25HD0045 · ₱32,965,900.00 · mapped
- UPGRADING (ASPHALT TO CONCRETE) OF BARILI-MANTAYUPAN RD-K0062+655-K0063+81318HF0076 · ₱32,639,952.60 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), ARGAO-MOALBOAL ROAD-K0066+032-K0066+469, K0067+300-K0067+989, K0067+989-K0068+07117HG0064 · ₱32,586,113.08 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED - PRIMARY ROADS, NATALIO BACALSO AVENUE (CEBU SOUTH RD) (S00281CB - S00285CB), CEBU18HE0020 · ₱30,655,964.97 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTU20HE0023 · ₱30,300,620.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF DUMLOG BRIDGE, DUMLOG, SIBONGA, CEBU 1ST LD17HE0010 · ₱29,404,555.53
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES (GABIONS), PINGGAN RIVER (DOWNSTREAM), PINGGAN, MINGLANILLA, CEBU18HE0010 · ₱27,839,545.89 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF LAMACAN RIVER (DOWNSTREAM AND UPSTREAM) LAMACAN, SIBONGA, CEBU 1ST LD17HE0011 · ₱27,636,630.14
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0033+616 - K0033+935, SAN FERNANDO, CEBU24HE0031 · ₱26,817,200.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) K0049+000 - K0049+660, SIBONGA, CEBU23HE0044 · ₱25,422,940.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SIBONGA-DUMANJUG RD - K0056+000 - K0057+242, SIBONGA, CEBU22HE0008 · ₱24,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT INCLUDING REINFORCED REVETMENT, PANGDAN RIVER, NAGA19HE0097 · ₱24,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENTS ALONG CARCAR RIVER, POBLACION II, CARCAR CIT20HE0016 · ₱24,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0017+750 - K0018+250, NAGA CITY, CEBU22HE0001 · ₱24,486,910.65 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0033+164 - K0033+935, SAN FERNANDO, CE24HE0214 · ₱24,074,085.07 · mapped
- LOCAL PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM - CONCRETING OF LOCAL ROAD, BARANGAY TAPUL - MANIPIS, TALISAY CITY, CEBU21HE0147 · ₱23,760,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHAB./RECONST./ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0028+903 - K0029+060, K0029+072 - K0029+832, SAN FERNANDO, C22HE0011 · ₱23,061,101.31 · mapped
- ORGANIZATIONAL OUTCONE 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0029+832-K0029+1675, SAN FERNANDO, CEBU23HE0107 · ₱22,980,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K000035+220 - K0035+451, K0035+451 - K0035+580, CARCAR CITY, CEBU24HE0039 · ₱21,649,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0042+128 - K0042 + 673, CARCAR CITY,25HD0010 · ₱20,305,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SIBONGA-DUMANJUG RD (S00290CB) K0052+000-K0052+460, K0052+485-K0053+05020HE0007 · ₱20,039,040.00 · mapped
- LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - ROAD CONCRETING, BRGY. LINAO, TALISAY CITY, CEBU20HE0097 · ₱19,600,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CARCAR-BARILI-MANTAYUPAN RD (S00289CB) K0043+588-K0044+000, K0044+462-K0045+0020HE0003 · ₱19,412,820.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 13108
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Jul 3, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 13108); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
5 evaluations listed across 3 GPPB CPES releases; average final rating 85.0% over 1 rated project; 5 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 7, 2025 | DPWH | 91,655,000.000 (₱ thousands, as printed; flagged) | On-going | 86.6% | — | 40th, p. 36 |
| Nov 17, 2023 | DPWH | ₱25,422,940.00 | Completed | 78.1% | 85.0% | 37th, p. 11 |
| Aug 22, 2023 | DPWH | ₱96,497,299.00 | On-going | 94.8% | — | 36th, p. 24 |
| Jun 2, 2023 | DPWH | ₱25,422,000.00 | On-going | 89.6% | — | 36th, p. 24 |
| May 29, 2023 | DPWH | ₱94,085,792.00 | On-going | 91.5% | — | 36th, p. 24 |
1 amount flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →