Roads24HN0073

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE - SECONDARY ROADS - UN AVENUE (CB) - CHAINAGE 0 - CHAINAGE 900, CHAINAGE 7 - CHAINAGE 220, CHAINAGE 2037 - CHAINAGE 2250, MANDAUE CITY, CEBU

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE - SECONDARY ROADS - UN AVENUE (CB) - CHAINAGE 0 - CHAINAGE 900, CHAINAGE 7 - CHAINAGE 220, CHAINAGE 2037 - CHAINAGE 2250, MANDAUE CITY, CEBU is a DPWH-tracked public work in Cebu 6th DEO, Region VII. Reported contract value: ₱25,480,000.00. Status: Reported complete (DPWH). Contractor on record: A S T BUILDERS. Figures trace to dpwh.

Cebu 6th DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.79

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-E-24-0011737 · ₱57,620,507 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24HN0073 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-08-05 → 2026-02-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE - SECONDARY ROADS - UN AVENUE (CB) - CHAINAGE 0 - CHAINAGE 900, CHAINAGE 7 - CHAINAGE 220, CHAINAGE 2037 -  CHAINAGE 2250, MANDAUE CITY, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 79%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Gate at Basak Creek, Lapu - Lapu City, Cebu
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-E-24-0011737

₱57,620,507.20 · FY2024

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

36 projects · ₱920.2M total · 0 flags

Other projects by this contractor

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANANGA RIVER, BARAN

Cebu City DEO, Region VII

2024₱96.4M
Reported complete (100% progress, DPWH status On-Going)

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANANGA RIVER, BARAN

Cebu City DEO, Region VII

2024₱96.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-PRIMARY ROADS-CEBU NORTH RD-(S00321CB) CHAINAGE 000-CHAINAGE 696, (S00016CB) K0001+(-048)-K0001+653, (S00017CB) K0003+(-1339)-K0003+(-839), CEBU CITY

Cebu City DEO, Region VII

2023₱91.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY - K0027+254 -K0027+475, CEBU CITY

Cebu City DEO, Region VII

2023₱71.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS - CEBU BALAMBAN TRANSCENTRAL HIGHWAY- K0025+134 - K0025+267, CEBU CITY

Cebu City DEO, Region VII

2023₱60.8M
Reported complete (DPWH)
No sat.

Construction of Flood Control Structure along Cansag River, Brgy Danglag (Phase IV), Consolacion, Cebu

CONSOLACION (CEBU), CEBU, Region VII

2022₱49.5M
Reported complete (DPWH)
View all 36 projects →

4. Implementation

Contract Amount

₱25,480,000.00

Progress

Reported complete (DPWH)

Start Date

February 23, 2024

Target End

April 11, 2024

5. Audit