A S T BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 36 linked DPWH project(s) totaling about ₱920,181,118.49. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
A S T BUILDERS
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 36
- Total value
- ₱920,181,118.49
- Published flags
- 0
- Region
- Cebu City DEO · Region VII
Online presence
Google Maps: A.S.T BUILDERS★ 5 (1 reviews)Google Maps, 2026-10-22
E-Park Building, Talamban Rd, Cebu City, 6000 Cebu
Licensed officers (PCAB)
- Anthony Caparas Tan · Authorized Managing Officer (PCAB license 34104) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for A S T BUILDERS — not an accusation or finding of wrongdoing.
Score: 91.20 / 100 · Projects in sample: 36 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 95.5/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 95.5
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 30
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 33
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 36
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 36
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
33 geotagged projects — Open full map · Download projects (CSV)
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANANGA RIVER, BARAN24HH0060 · ₱96,420,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANANGA RIVER, BARAN24HH0020 · ₱96,420,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-PRIMARY ROADS-CEBU NORTH RD-(S00321CB) CHAINAGE 000-CHAINAGE 696, (S00016CB) K0001+(-048)-K0001+653, (S00017CB) K0003+(-1339)-K0003+(-839), CEBU CITY23HH0054 · ₱91,391,941.96 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY - K0027+254 -K0027+475, CEBU CITY23HH0089 · ₱71,409,961.89 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS - CEBU BALAMBAN TRANSCENTRAL HIGHWAY- K0025+134 - K0025+267, CEBU CITY23HH0076 · ₱60,795,000.00 · mapped
- Construction of Flood Control Structure along Cansag River, Brgy Danglag (Phase IV), Consolacion, Cebu22HN0076 · ₱49,500,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL AND MITIGATION STRUCTURES AT BUTUANON RIVER, BRGY. PIT-OS, CEBU CITY17HH0008 · ₱48,896,326.72
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND -DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER (PHASE V), CONSOLACION, CEBU21HN0010 · ₱46,403,000.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. PULANGBATO, CEBU CITY18HH0051 · ₱41,807,023.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, GUADALUPE RIVER, BRGY. KALUNASAN, CEBU CITY18HH0047 · ₱32,503,433.96 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - CEBU - BALAMBAN - TRANSCENTRAL HIGHWAY - K0016+127-K0016+160, K00120HH0057 · ₱31,311,888.88 · mapped
- CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROAD W/DRAINAGE FACILITIES, BRGY. UMAPAD, MANDAUE CITY, CEBU23HN0105 · ₱29,688,388.50 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE - SECONDARY ROADS - UN AVENUE (CB) - CHAINAGE 0 - CHAINAGE 900, CHAINAGE 7 - CHAINAGE 220, CHAINAGE 2037 - CHAINAGE 2250, MANDAUE CITY, CEBU24HN0073 · ₱25,480,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT GUADALUPE RIVER, BRGY. GUADALUPE, CEBU C19HH0049 · ₱20,803,931.54 · mapped
- CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD AT GREENHILLS SUBDIVISION, BRGY. CASUNTINGAN, MANDAUE CITY, CEBU23HN0170 · ₱19,251,530.16 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - CEBU NORTH HAGNAYA WHARF RD - (S00269CB) CHAINAGE 000 - CHAINAGE 043, CHAINAGE 193 - CHAINAGE 693, MANDAUE CITY, CEBU23HN0024 · ₱18,897,888.50 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- MAGALLANES ST. - (S00082CB) - CHAINAGE 022 - CHAINAGE 433, CEBU CITY22HH0022 · ₱16,428,880.58 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - M LOGARTA RD - (S00192CB) CHAINAGE 137 - CHAINAGE 734, CHAINAGE 854 -CHAINAGE 1328, MANDAUE CITY, CEBU23HN0008 · ₱15,962,688.44 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU-BALAMBAN TRANSCENTRAL HIGHWAY-K0016+165 - K0016+201, CEBU CITY24HH0085 · ₱13,688,500.78 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - TERTIARY ROADS, R. PALMA ST., (S00154CB) CHAINAGE 0 - CHAINAGE 379, CEBU CITY19HH0099 · ₱13,498,907.91 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-TERTIARY ROADS-CANDUMAN-CEBU NORTH RD-K0011+(-639) -K0011 + (-210), K0012 +415-K0012 + 467, K0013 + 000 - K0013 + 195, MANDAUE CITY, CEBU23HN0011 · ₱9,788,775.57 · mapped
- Construction of Drainage System along R. A. Ouano Road, Barangay Opao, Mandaue City, Cebu24HN0075 · ₱9,774,508.23 · mapped
- OO1: PRIMARY ROADS - CNHWR - K0005 + 492 - K0005 + 714 (MODIFIED TO: OO1: ENSURE SAFE & RELIABLE NATIONAL RD. SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINT.-PRIMARY ROADS -CEBU NORTH HAGNAYA WHARF RD-K0005 + 492 -K0005 + 676), MANDAUE CITY21HN0106 · ₱9,299,588.88 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE - PRIMARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0010+000 - K0010+222, MANDAUE CITY, CEBU21HN0062 · ₱9,299,388.88 · mapped
- CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF S.B. CABAHUG ST. WITH DRAINAGE FACILITIES, MANDAUE CITY, CEBU24HN0086 · ₱7,714,560.00 · mapped
- CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES, BRGY. LABANGON, CEBU CITY17HH0021 · ₱6,369,929.98
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY KALUBIHAN, CEBU CITY, CEBU23HH0040 · ₱4,941,952.44 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES-REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. PARIAN, CEBU CITY24HH0073 · ₱4,941,396.01 · mapped
- CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF DRAINAGE FACILITIES AT BRGY. OPAO, MANDAUE CITY, CEBU23HN0171 · ₱4,786,251.45 · mapped
- LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BAKILID, MANDAUE CITY, CEBU20HN0047 · ₱2,962,703.16 · mapped
- LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES - REHABILITATION OF MULTI-PURPOSE BUILDING,BARANGAY BASAK, MANDAUE CITY, CEBU21HN0126 · ₱2,879,900.60 · mapped
- LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI PURPOSE / FACILITIES - REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY DAY-AS, CEBU CITY21HH0129 · ₱1,972,015.65 · mapped
- CONCRETING OF BRGY. BABAG FARM TO MARKET ROAD (PHASE II), BRGY. BABAG, CEBU CITY17HH0049 · ₱1,934,955.22
- LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURE - MULTI PURPOSE / FACILITIES - REHABILITATION OF MULTI - PURPOSE BUILDING, BRGY. LUZ, CEBU CITY20HH0035 · ₱998,817.24 · mapped
- LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI PURPOSE / FACILITIES - REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. DAY-AS, CEBU CITY21HH0104 · ₱992,498.24 · mapped
- LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURE - MULTI PURPOSE / FACILITIES - REHABILITATION OF MULTI - PURPOSE BUILDING, BRGY. SAN ANTONIO, CEBU CITY20HH0079 · ₱964,584.12 · mapped
Equipment & capacity
PCAB license
- License no.
- 34104
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Nov 4, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 34104); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
9 evaluations listed across 5 GPPB CPES releases; average final rating 94.6% over 5 rated projects; 9 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 25, 2025 | DPWH (JV) | ₱96,420,000.00 | Completed | 93.8% | 94.8% | 39th (rev), p. 10 |
| Oct 28, 2024 | DPWH (JV) | ₱86,704,127.00 | Completed | 95.8% | 95.8% | 39th (rev), p. 10 |
| Oct 10, 2024 | DPWH (JV) | ₱96,420,000.00 | On-going | 95.5% | — | 39th (rev), p. 118 |
| Oct 10, 2024 | DPWH (JV) | ₱86,697,376.00 | Completed | 97.5% | 97.5% | 39th (rev), p. 118 |
| Apr 15, 2024 | DPWH | ₱29,713,321.00 | Completed | 89.1% | 93.5% | 38th, p. 9 |
| Nov 14, 2023 | DPWH | ₱29,713,321.00 | On-going | 96.4% | — | 37th, p. 4 |
| Aug 22, 2023 | DPWH (JV) | ₱91,391,942.00 | On-going | 89.7% | — | 36th, p. 7 |
| Mar 6, 2023 | DPWH | ₱49,501,437.00 | Completed | 93.3% | 91.5% | 35th, p. 7 |
| Sep 30, 2022 | DPWH | ₱49,500,000.00 | On-going | 90.3% | — | 35th, p. 7 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →