Construction of Flood Mitigation Structure23PK0010

Construction of Sukot Flood Control along Chico River, Sta. 188 + 650 - Sta. 188 + 800 (RS), Poblacion, Tinglayan, Kalinga

Construction of Sukot Flood Control along Chico River, Sta. 188 + 650 - Sta. 188 + 800 (RS), Poblacion, Tinglayan, Kalinga is a DPWH-tracked public work in TINGLAYAN (KALINGA), KALINGA, Cordillera Administrative Region. Reported contract value: ₱9,798,721.60. Status: Reported complete (DPWH). Contractor on record: FEREST DWAYNE CONST. Figures trace to sumbong.

TINGLAYAN (KALINGA), KALINGA, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱10,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23PK0010 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-29 → 2023-08-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱65,325 per linear m= 0.9x the Cordillera Administrative Region median (n=212)

Contract cost ₱9,798,722 ÷ 150 linear m read from the DPWH title (“Sta. 188 + 650 - Sta. 188 + 800”; station range length (Sta. a+b to c+d)). National percentile: 21. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Kalinga

Based on the coordinates published with the DPWH record and NOAH file Kalinga.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Sukot Flood Control along Chico River, Sta. 188 + 650 - Sta. 188 + 800 (RS), Poblacion, Tinglayan, Kalinga

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Sukot Flood Control along Chico River, Sta. 188 + 650 - Sta. 188 + 800 (RS), Poblacion, Tinglayan, Kalinga
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Upper Kalinga District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

23 projects · ₱172.2M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL PROGRAM - CONSTRUCTION /IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES / POBLACION TINGLAYAN - TULGAO EAST - TULGAO WEST IN SUPPORT OF PROCESSED FOOD INDUSTRY, BLACKSMITH INDUSTRY, AND RATTAN/BAMBOO W

Upper Kalinga DEO, Cordillera Administrative Region

2020₱14.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF CHARAG FLOOD CONTROL ALONG C

Upper Kalinga DEO, Cordillera Administrative Region

2024₱14.1M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF SAMANG-SAIT FLOOD CONTROL AL

Upper Kalinga DEO, Cordillera Administrative Region

2024₱12.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES / POBLACION TINGLAYAN - TULGAO EAST - TULGAO WEST IN SUPPORT OF PROCESSED FOOD INDUSTRY, BLACKSMITH INDUSTRY, AND RATTAN/B

Upper Kalinga DEO, Cordillera Administrative Region

2021₱12.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: BUTBUT PROPER - TULGAO - DANANAO- SUMADEL - MALLANGO ROAD LEADING TO TULGAO AND SUMADEL RICE TERRACES, PALANG-AH FALLS AND HOTSPRING

Upper Kalinga DEO, Cordillera Administrative Region

2022₱9.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) BUTBUT PROPER - TULGAO - DANANAO - SUMADEL - MALLANGO ROAD LEADING TO TULGAO AND SUMADEL R

Upper Kalinga DEO, Cordillera Administrative Region

2023₱9.8M
Reported complete (DPWH)
View all 23 projects →

4. Implementation

Contract Amount

₱9,798,721.60

Progress

Reported complete (DPWH)

Start Date

April 14, 2023

Target End

October 10, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaTinglayanPoblacion
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
Active faultLandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.