Buildings and Facilities20PE0068

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TAWANG, TAWANG, LA TRINIDAD, BENGUET

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TAWANG, TAWANG, LA TRINIDAD, BENGUET is a DPWH-tracked public work in Benguet 1st DEO, Cordillera Administrative Region. Reported contract value: ₱2,954,978.52. Status: Reported complete (DPWH). Contractor on record: TAGEL CORP. Figures trace to dpwh.

Benguet 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱25,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20PE0068 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-19 → 2025-10-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TAWANG, TAWANG, LA TRINIDAD, BENGUET

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Agno River Basin, Ekip Section, Bokod, Benguet
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Benguet 1st DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

62 projects · ₱2.1B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING (BENGUET SPORTS COMPLEX AND FACILITIES) AT BARANGAY WANGAL, LA TRINIDAD, BENGUET

Cordillera Administrative Region, Cordillera Administrative Region

2021₱163.3M
Reported complete (DPWH)

Construction of Flood Control Structure along Apayao River Basin, Tanglagan Section, Calanasan, Apayao

CALANASAN (BAYAG) (APAYAO), APAYAO, Cordillera Administrative Region

2023₱96.5M
Reported complete (DPWH)

Construction of Apayao-Abulug River Basin Flood Control Structure, Capannikian Section, Sta. 34 + 440 - Sta. 34 + 995 (R/S), Pudtol, Apayao

PUDTOL (APAYAO), APAYAO, Cordillera Administrative Region

2023₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - AYAGA-STA. MARCELA-FLORA-LASAM RD - K0679 + 000 - K0680 + 500

Apayao 2nd DEO, Cordillera Administrative Region

2024₱94.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF APAYAO RIVER FLOOD CONTROL

Apayao 1st DEO, Cordillera Administrative Region

2024₱93.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF KARAGAWAN RIVER FLOOD CONTROL, STA. 81+404 - STA. 82+456 (L/S), KARAGAWAN, K

Apayao 1st DEO, Cordillera Administrative Region

2024₱93.6M
Reported complete (100% progress, DPWH status On-Going)
View all 62 projects →

4. Implementation

Contract Amount

₱2,954,978.52

Progress

Reported complete (DPWH)

Start Date

June 3, 2020

Target End

October 30, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.