TAGEL CORP is listed as a company organization in Philippine public procurement records on this site, with 62 linked DPWH project(s) totaling about ₱2,103,102,837.03. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
TAGEL CORP
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 62
- Total value
- ₱2,103,102,837.03
- Published flags
- 0
- Region
- Apayao 2nd DEO · Cordillera Administrative Region
Licensed officers (PCAB)
- JERIC LLOYD ESTEBAN FELIPE · Authorized Managing Officer (PCAB license 43554) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for TAGEL CORP — not an accusation or finding of wrongdoing.
Score: 83.40 / 100 · Projects in sample: 62 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 73/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 73
- lateCompletedProjects
- 25
- onTimeCompletedProjects
- 32
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 59
- pastTargetOngoingProjects
- 2
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 62
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 62
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 62
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 62
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 62 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING (BENGUET SPORTS COMPLEX AND FACILITIES) AT BARANGAY WANGAL, LA TRINIDAD, BENGUET21P00023 · ₱163,350,000.00 · mapped
- Construction of Flood Control Structure along Apayao River Basin, Tanglagan Section, Calanasan, Apayao23PC0038 · ₱96,500,000.00 · mapped
- Construction of Apayao-Abulug River Basin Flood Control Structure, Capannikian Section, Sta. 34 + 440 - Sta. 34 + 995 (R/S), Pudtol, Apayao23PC0029 · ₱96,481,880.32 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - AYAGA-STA. MARCELA-FLORA-LASAM RD - K0679 + 000 - K0680 + 50024PC0019 · ₱94,541,048.34 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF APAYAO RIVER FLOOD CONTROL24PB0011 · ₱93,604,999.99 · mapped
- 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF KARAGAWAN RIVER FLOOD CONTROL, STA. 81+404 - STA. 82+456 (L/S), KARAGAWAN, K24PB0002 · ₱93,594,188.93 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS -CLAVERIA-CALANASAN-KABUGAO ROAD- K0662+905 - K0663+00023PC0024 · ₱93,264,277.77 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD-K0632+007-K0632+19422PC0059 · ₱91,448,479.06 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD - K0632+194-K0632+31022PC0060 · ₱90,613,500.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO RD-K0662+667-K0662+74223PC0048 · ₱82,118,730.35 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, APAYAO-ILOCOS NORTE ROAD K0621+290-K0621+39022PB0002 · ₱74,882,374.91 · mapped
- NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS, APAYAO-CAGAYAN ROAD (ILI-GUINAMGAMMAN-RIZAL ROAD) - (S00694LZ) CHAINAGE 0 - CHAINAGE 302723PB0013 · ₱72,375,000.00 · mapped
- NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS ADAMS (ILOCOS NORTE)-CALANASAN (APAYAO) ROAD, BUCAROT BRIDGE, APAYAO-CONSTRUCTION OF STEEL BRIDGE22PC0022 · ₱56,432,363.15 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES-SALAGUNTING BR. 1 (B01049LZ) ALONG CLAVERIA-CALANASAN-KABUGAO RD.22PC0036 · ₱48,363,078.14 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS - APAYAO-ILOCOS NORTE ROAD- K0651+666 - K0651+69923PC0028 · ₱48,020,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD - K0643+829 - K0643+86723PC0022 · ₱48,018,505.21 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES SAN SEBASTIAN - SAN JOSE - SAN FRANCISCO ROAD IN SUPPORT OF HANDICRAFT, FURNITURE, PROCESSED HIGH VALUE CROPS, VEGETABLE RICE AND CORN INDUSTRIES, LUNA, APAYAO21PC0060 · ₱47,747,782.13 · mapped
- CSSP-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - ANNINIPAN - PANTAY PANTAY ROAD IN SUPPORT OF RICE, CORN AND BANANA INDUS24PC0007 · ₱47,529,999.66 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD- K0677+904 - K0677+98223PC0036 · ₱44,098,327.64 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD - K0686+000 - K0686+08223PC0006 · ₱44,095,734.25 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD- K0700+712 - K0700+76523PC0030 · ₱43,500,240.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS - APAYAO - ILOCOS NORTE ROAD - K0636+000 - K0636+73023PC0004 · ₱34,696,899.86 · mapped
- CONSTRUCTION OF SABANGAN FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, POBLACION, CALANASAN, APAYAO20PC0020 · ₱28,960,165.92 · mapped
- (CSSP)-CONST./IMPR. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) - SAN SEBASTIAN-SAN JOSE-SAN FRANCISCO ROAD IN SUPPORT OF HANDICRAFT, FURNITURE, PROCESSED HIGH VALUE CROPS, VEGETABLE RICE AND CORN INDUSTRIES, LUNA, APAYAO22PC0055 · ₱24,151,999.32 · mapped
- Construction of Apayao River Flood Control Structure, Sta. 82+292 - Sta. 82+592, Brgy. Nagbabalayan, Kabugao, Apayao22PB0018 · ₱23,872,800.00 · mapped
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJORRIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MITIGATIONSTRUCTURE ALONG AGNO RIVER BASIN, EKIP SECTIONG AND SERVICES, BOKOD, BENGUET20PE0048 · ₱23,719,638.10 · mapped
- NETWORK DEVELOPMENT -PAVING OF UNPAVED ROADS, TERTIARY ROADS, APAYAO-ILOCOS NORTE RD, K0643+176- K0643+67620PB0021 · ₱21,949,883.25 · mapped
- NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROAD, APAYAO-ILOCOS NORTE RD K0635+714+100022PB0011 · ₱20,740,720.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: SLURRY SURFACE TREATMENT 12MM - SPECIFIC LOCATIONS ALONG GUREL-BOKOD-KABAYAN-BUGUIAS- ABATAN ROAD (S00386LZ), K0304+024 - K0310+000, BOKOD, BENGUET19PE0005 · ₱19,536,669.27 · mapped
- CSSP-CONS/IMPROVEMENT OF ACCESS RDS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES(RDS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA PROG-ROLL-IT)-SAN SEBASTIAN-SAN JOSE-SAN FRANCISCO RD IN SUPPORT OF HANDICRAFT,FURNITURE,PROCESSED HIGH VALUE CROPS,VEGET24PC0069 · ₱19,012,685.06 · mapped
- OFF-CARRIAGE IMPROVEMENT: SHOULDER PAVING / RECONSTRUCTION - SPECIFIC LOCATION ALONG BENGUET NUEVA VIZCAYA ROAD (S00382LZ), K0308+000 - K0310+500, BOKOD, BENGUET20PE0022 · ₱18,354,972.78 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION OF STO. NINO FLOOD CONTROL, BRGY. AMBASSADOR, TUBLAY, BENGUET19PF0002 · ₱17,920,797.51 · mapped
- LOCAL INFRASTRUCTURE PROGRAM: CONSTRUCTION OF FLOOD CONTROL FROM BASIL TO TUBLAY CENTRAL TUBLAY, BENGUET19PF0042 · ₱16,979,682.50 · mapped
- CONSTRUCTION (COMPLETION) OF 3-STOREY BUILDING OF REGIONAL INTERNAL AFFAIRS HEADQUARTERS, LA TRINIDAD, BENGUET19PE0088 · ₱16,660,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD JCT. TO BANGHO-DACLAN-BASIL-TUBLAY CENTRAL ROAD IN SUPPORT OF COFFEE, BAMBOO, CUTFLOWERS A19PF0005 · ₱14,599,556.71 · mapped
- NETWORK DEVELOPMENT PROGRAM-OFF CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS,APAYAO-ILOCOS NORTE ROAD-K06122PB0032 · ₱12,504,800.00 · mapped
- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS: RECONSTRUCTION TO CONCRETE PAVEMENT - SPECIFIC LOCATION ALONG GUREL-BOKOD-KABAYAN-BUGUIAS- ABATAN ROAD (S00386 LZ) INDUSTRIES, K0308+300 - K0308+650, BOKOD, BENGUET19PE0015 · ₱12,158,767.00 · mapped
- NETWORK DEVELOPMENT- PAVING OF UNPAVED ROADS-TERTIARY ROADS, APAYAO-ILOCOS NORTE RD(S00622LZ), K0635+406 - K0635+71421PB0003 · ₱12,073,600.00 · mapped
- LOCAL ROADS AND BRIDGES-LOCAL ROADS-LOCAL INFRASTRUCTURE PROGRAM-CONCRETING OF ROAD, SISIRITAN MATAGUISI, PUDTOL, APAYAO21PC0051 · ₱9,899,500.58 · mapped
- NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-PENRO APAYAO (BUROT)-SAN ISIDRO-QUIRINO ROAD, LUNA, APAYAO21PC0048 · ₱9,799,993.11 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS LYDIA-LALANGGAN ROAD LEADING TO PUDTOL TOURISM SITES, PUDTOL, APAYAO21PC0030 · ₱9,799,931.30 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION-KABANGWELAN ROAD LEADING TO VILLAMOR FALLS, LUNA, APAYAO21PC0049 · ₱9,799,758.06 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES BAGUIO-BONTOC ROAD JCT.- KING SOLOMON - COROZ - STO. NINO - TABEYO ROAD19PF0011 · ₱9,769,850.09 · mapped
- NETWORK DEVELOPMENT PROGRAM-PAVING OF UNPAVED ROADS-TERTIARY ROADS-AYAGA-STA. MARCELA-FLORA-LASAM ROAD-K0697+057-K0697+457, FLORA, APAYAO21PC0026 · ₱9,751,350.08 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES: CONSTRUCTION OF CONCRETE ROAD - SPECIFIC LOCATION ALONG BAGUIO-BONTOC ROAD JCT. TO GUIWENG-NAWAL-TICKEY-DACLAN ROAD IN SUPPORT OF COFFEE AND PROCESSED FOOD MEAT IND19PE0014 · ₱9,746,829.44 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES BANGHO-DACLAN-BASIL-TUBLAY CENTRAL ROAD IN SUPPORT OF COFFEE, BAMBOO, FOOD AND FEED CROPS, CUTFLOWERS AND FRUIT TREES INDUST20PF0003 · ₱9,702,000.00 · mapped
- CONVERGENCE & SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES KING SOLOMON - STO. NINO - COROZ - TABEYO ROAD IN SUPPORT TO COFFEE, CACAO, BAMBOO CUT FLOWER HEIRLOOM RICE, LIVESTOCK, AND OTHE20PF0006 · ₱9,702,000.00 · mapped
- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJORRIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MITIGATIONSTRUCTURE ALONG AGNO RIVER BASIN, TAAL-BENGAO SECTION, BRGY. AMBUKLAO, BOKOD, BENGUET20PE0050 · ₱9,701,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADE, INDUSTRIES AND ECONOMIC ZONES STA. MARIA-MALLIG ROAD IN SUPPORT OF FURNITURE, HANDICRAFTS, BANANA, RICE, CORN AND TOURISM INDUSTRIES21PC0014 · ₱9,408,412.38 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS SAN CARLOS-NUEVA-MARCELA ROAD LEADING TO BACUT LAKE, STA. MARCELA, APAYAO21PC0024 · ₱9,408,201.66 · mapped
Equipment & capacity
PCAB license
- License no.
- 43554
- Category
- AA · Large A
- Minimum net worth for this category
- ₱90,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱450M
- License valid until
- Feb 1, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 43554); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
21 evaluations listed across 5 GPPB CPES releases; average final rating 93.7% over 9 rated projects; 21 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Feb 18, 2025 | DPWH (JV) | ₱140,883,382.00 | Completed | 93.3% | 96.2% | 39th (rev), p. 210 |
| Feb 18, 2025 | DPWH | ₱94,541,048.00 | On-going | 89.4% | — | 39th (rev), p. 209 |
| Feb 18, 2025 | DPWH (JV) | ₱140,471,371.00 | Completed | 96.8% | 97.6% | 39th (rev), p. 209 |
| Dec 2, 2024 | DPWH | ₱94,541,048.00 | On-going | 94.3% | — | 39th (rev), p. 209 |
| Aug 19, 2024 | DPWH (JV) | ₱140,471,371.00 | On-going | 98.2% | — | 38th, p. 235 |
| Aug 19, 2024 | DPWH | ₱47,530,000.00 | On-going | 98.2% | — | 38th, p. 235 |
| Aug 16, 2024 | DPWH | ₱93,605,000.00 | On-going | 94.6% | — | 38th, p. 234 |
| May 20, 2024 | DPWH | ₱34,696,900.00 | Completed | 91.2% | 86.6% | 38th, p. 234 |
| May 20, 2024 | DPWH | ₱93,264,278.00 | Completed | 99.5% | 96.6% | 38th, p. 234 |
| May 18, 2024 | DPWH | ₱72,375,000.00 | Completed | 99.7% | 95.0% | 38th, p. 234 |
| Sep 14, 2023 | DPWH | ₱70,202,252.00 | On-going | 89.9% | — | 36th, p. 205 |
| Sep 14, 2023 | DPWH (JV) | ₱49,000,000.00 | Final | 91.2% | 93.5% | 36th, p. 206 |
Showing the 12 most recent of 21.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 59 awards · ₱2,113,348,218.33
- Municipality of Bauko, Mountain Province Infrastructure: 1 award · ₱80,179,681.44
- Province of Apayao Infrastructure: 2 awards · ₱19,632,068.81
- CIVIL WORKS₱19,012,685.06· 2024-06-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱94,541,048.34· 2024-02-08· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- Construction Projects₱93,604,999.99· 2024-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 1ST DEO
- Construction Projects₱93,594,188.93· 2024-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 1ST DEO
- CIVIL WORKS₱47,529,999.66· 2024-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱82,118,730.35· 2023-04-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱4,752,999.73· 2023-04-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱92,560,435.76· 2023-04-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- Construction Projects₱70,202,252.06· 2023-03-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 1ST DEO
- CIVIL WORKS₱42,776,999.91· 2023-03-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱46,579,399.98· 2023-03-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱46,579,399.97· 2023-03-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱42,195,232.73· 2023-03-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱42,777,000.00· 2023-03-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱93,601,758.95· 2023-03-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱93,264,277.77· 2023-02-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱4,845,471.67· 2023-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱4,850,375.15· 2023-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱34,696,899.86· 2023-01-31· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱48,363,078.14· 2022-08-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱88,700,353.43· 2022-03-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- CIVIL WORKS₱87,890,038.87· 2022-03-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
- Construction Projects₱23,154,236.27· 2022-03-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 1ST DEO
- Construction Projects₱12,129,160.23· 2022-03-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 1ST DEO
- CIVIL WORKS₱23,431,417.32· 2022-03-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - APAYAO 2ND DEO
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →