Construction of Apayao-Abulug River Basin Flood Control Structure, Capannikian Section, Sta. 34 + 440 - Sta. 34 + 995 (R/S), Pudtol, Apayao
Construction of Apayao-Abulug River Basin Flood Control Structure, Capannikian Section, Sta. 34 + 440 - Sta. 34 + 995 (R/S), Pudtol, Apayao is a DPWH-tracked public work in PUDTOL (APAYAO), APAYAO, Cordillera Administrative Region. Reported contract value: ₱96,481,880.32. Status: Reported complete (DPWH). Contractor on record: TAGEL CORP. Figures trace to sumbong.
Total Contract Cost



