Construction of Revetment along Mabato River Sta. 2+800 - Sta. 3+110 L/S (Junction with Overflow bridge), Barangay Bantac, Magpet, Cotabato
Construction of Revetment along Mabato River Sta. 2+800 - Sta. 3+110 L/S (Junction with Overflow bridge), Barangay Bantac, Magpet, Cotabato is a DPWH-tracked public work in MAGPET (COTABATO (NORTH COTABATO)), COTABATO (NORTH COTABATO), Region XII. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: JARGON CONST & SUPPLY. Figures trace to sumbong.
Total Contract Cost