Rehabilitation / Major Repair of Flood Control Structure along Davao River, Bolton Bridge Upstream, Left Bank, Davao City (Sta. 1+614 - Sta. 2+173)
Rehabilitation / Major Repair of Flood Control Structure along Davao River, Bolton Bridge Upstream, Left Bank, Davao City (Sta. 1+614 - Sta. 2+173) is a DPWH-tracked public work in DAVAO DEL SUR, Region XI. Reported contract value: ₱77,200,000.00. Status: Reported complete (DPWH). Contractor on record: JARGON CONST & SUPPLY. Figures trace to sumbong.
Total Contract Cost



