Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Davao City District Engineering Office awarded 115 of 122 recorded flood-control contracts (94.3%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (23.9 percentage points higher; binomial p = 4.6e-11), across 52 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from consistently competitive bidding or precise cost estimation practices in the office.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Davao City District Engineering Office: contracts
115 of 122 contracts (94.3%) at ≥99.5% of ABC · peer baseline 70.4% · gap +23.9 pts · binomial p = 4.6e-11. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 21LB0295 | Construction of Drainage Structure, Eagle Street, Phase 2, Barangay Bucana, Davao City | GRECO CONST AND SUPPLY | 100.00% | DPWH |
| 23LB0141 | Construction of Revetment along Matina River protecting Matina Pangi Road, Sta. 7+000 to Sta. 7+300 Right Bank, Davao City | AGONG BUILDERS AND CONST SUPPLY INC / GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0233 | Construction of Drainage System at Dr. Santiago Dakudao National High School, Malagamot, Barangay Panacan, Davao City | AGONG BUILDERS AND CONST SUPPLY INC | 100.00% | DPWH |
| 21LB0253 | Construction of Revetment along Talomo River, Sta. 3+817 to Sta. 4+022, Right Bank, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 21LB0017 | Rehabilitation / Major Repair of Flood Control Structure along Davao River, Sandawa Section, Right Bank, Davao City (Sta. 2+246 - Sta. 2+635) | THREE W BUILDERS INC | 100.00% | DPWH |
| 20LB0084 | Construction of Drainage Structure - Davao City Div Rd - K1501+860, La Verna Section, Davao City | ACD ASTROBUILT CONST & DEVELOPMENT INC FORMERLY:ASTROBUILT CONST & DEVELOPMENT / ABU CONST | 100.00% | DPWH |
| 20LB0084 | Construction of Drainage Structure - Davao City Div Rd - K1501+860, La Verna Section, Davao City | ACD ASTROBUILT CONST & DEVELOPMENT INC FORMERLY:ASTROBUILT CONST & DEVELOPMENT / ABU CONST | 100.00% | DPWH |
| 21LB0115 | Construction of Flood Mitigation Facility - Davao City Div Rd, Laverna Section, Brgy. Buhangin, Davao City | RELY CONST & SUPPLY INC FORMERLY: RELY CONST AND SUPPLY | 100.00% | DPWH |
| 22LB0376 | Rehabilitation of Drainage System at Barangay 23-C, Davao City | BQPC CORP | 100.00% | DPWH |
| 21LB0309 | Construction Flood Mitigation Structure protecting Daang Maharlika (MN) at Brgy. Bunawan, Davao City | RELY CONST & SUPPLY INC FORMERLY: RELY CONST AND SUPPLY | 100.00% | DPWH |
| 22LB0371 | Construction of Drainage System at Purok 7 & 9, Barangay 39-D, Davao City | C'ZARLES CONST & SUPPLY | 100.00% | DPWH |
| 23L00030 | Construction of Revetment along Matina River, Matina Pangi Bridge II Downstream, Both Banks, Davao City | GENESIS88 CONST INC / ABU CONST | 100.00% | DPWH |
| 22LB0298 | Rehabilitation of Revetment along Davao River, Purok 6, Platinum St. San Rafael Village Section, Barangay 10-A, Davao City | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 21LB0292 | Construction of Revetment along Matina River, Outfall Section, Sta. 0+115 to Sta. 0+465, Left Bank, Davao City | MRD GEMPESAW CONST CORP / MONOLITHIC CONST & CONCRETE PRODUCTS INC | 100.00% | DPWH |
| 21LB0301 | Construction of Flood Mitigation Structure along Bago Gallera Creek, Rosalina Village Section, Left Bank, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0288 | Rehabilitation of Matina Pangi Creek Protecting Davao City Diversion Road (Matina Pangi Section, Right Bank) going to Matina River Outfall, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 21LB0322 | Construction of Flood Control Mitigation Structure at Panacan River, Davao City | GENESIS88 CONST INC / GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON | 100.00% | DPWH |
| 22LB0285 | Construction of Revetment along Matina River, Asico Bridge Upstream Section, Left Bank, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0122 | Construction of Revetment along Panacan River, Sta. 1+400 - Sta. 1+700, South Side, Right Bank, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 21LB0246 | Construction of Revetment along Talomo River, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 21LB0306 | Construction of Drainage System leading to Dacudao Maindrain, Davao City | MAER SUMMIT KONSTRUKT CO | 100.00% | DPWH |
| 21LB0252 | Construction of Revetment along Talomo River, Sta. 3+747 to Sta. 3+952, Left Bank, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0415 | Construction of Seawall from San Jose connecting Seawall of Brgy. Leon Garcia, San Jose, IKP & MASEA, Brgy. Gov. Vicente Duterte, Agdao, Davao City | AGONG BUILDERS AND CONST SUPPLY INC | 100.00% | DPWH |
| 22LB0373 | Construction of Flood Mitigation Structure at Purok 16, Block 2, Barangay Catalunan Pequeño, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 21LB0018 | Construction of Flood Mitigation Structure, F. Torres Bridge (Downstream), Davao River, Brgy 9-A, Davao City | VICENTE T LAO CONST | 100.00% | DPWH |
| 22LB0245 | Rehabilitation of existing Flood Mitigation Structure at Barangay 17-B Poblacion, Davao City | CJEP BUILDERS AND ENGINEERING SERVICES | 100.00% | DPWH |
| 22LB0355 | Construction of Revetment along Talomo - Puan Bypass Bridge Upstream, Right Bank, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0354 | Construction of Revetment along Talomo - Puan Bypass Bridge Upstream, Left Bank, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0029 | Construction of Flood Mitigation Structure along Maa Creek, Sta. 0+487 - Sta. 0+937, Don Julian Rodriguez Ave Section, Left Bank Section, Davao City | ARCINUE COMM'L CORP / MINDALIFI CONST AND SUPPLY | 100.00% | DPWH |
| 22LB0358 | Construction of Drainage at Lanzona Subd. To Shanghai Creek, Barangay Matina Aplaya, Davao City | MITZ CONST AND SUPPLY | 100.00% | DPWH |
| 22LB0287 | Rehabilitation of Matina Pangi Creek Protecting Davao City Diversion Road (Matina Pangi Section, Left Bank) going to Matina River Outfall, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 21LB0016 | Rehabilitation / Major Repair of Flood Control Structure along Davao River, Bolton Bridge Upstream, Left Bank, Davao City (Sta. 1+614 - Sta. 2+173) | JARGON CONST & SUPPLY | 100.00% | DPWH |
| 22LB0367 | Construction of Drainage System at Purok 1, Barangay Baliok, Talomo District, Davao City | AGONG BUILDERS AND CONST SUPPLY INC | 100.00% | DPWH |
| 20LB0024 | Construction of Revetment - Davao River Flood Control, Bolton Bridge Upstream, S.I.R New Matina Phase 1 Section, Right Bank, Davao City | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 20LB0170 | Construction of Revetment along Matina River, Sta. 2+983 to Sta. 3+173, Davao City | ABU CONST | 100.00% | DPWH |
| 20LB0170 | Construction of Revetment along Matina River, Sta. 2+983 to Sta. 3+173, Davao City | ABU CONST | 100.00% | DPWH |
| 20LB0244 | Construction of Revetment along Davao River, Bolton Bridge Upstream, S.I.R. New Matina, Ph 1, Sandawa Main Drain Section, Right Bank, Davao City | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 20LB0244 | Construction of Revetment along Davao River, Bolton Bridge Upstream, S.I.R. New Matina, Ph 1, Sandawa Main Drain Section, Right Bank, Davao City | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 22LB0369 | Construction of Drainage System at Purok 5, Ledesma Subd., Barangay 10-A, Davao City | CJEP BUILDERS AND ENGINEERING SERVICES | 100.00% | DPWH |
| 21LB0118 | Drainage System Leading to Dacudao Maindrain, Davao City | ABU CONST | 100.00% | DPWH |
| 20LB0027 | Construction of Revetment along Matina River, Sta. 3+060 to Sta. 3+520, Davao City | A Y U ENGINEERING & CONST / ABU CONST | 100.00% | DPWH |
| 20LB0027 | Construction of Revetment along Matina River, Sta. 3+060 to Sta. 3+520, Davao City | A Y U ENGINEERING & CONST / ABU CONST | 100.00% | DPWH |
| 21LB0298 | Construction of Revetment along Matina River, Matina Pangi Bridge-I Upstream, Matina Pangi Section, Left Bank, Davao City | THREE W BUILDERS INC | 100.00% | DPWH |
| 23LB0037 | Construction of Revetment along Bunawan River, Sta. 0 + 000 - Sta. 0 + 426, East Side, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 21LB0302 | Construction of Drainage System at Libby Bridge, Purok 6, Bago Gallera. Talomo District, Davao City | GRECO CONST AND SUPPLY | 100.00% | DPWH |
| 21LB0248 | Construction of Revetment along Talomo River, Sta. 0+000 - Sta. 0+213, Sta. 0+405 - Sta. 0+460,Left Bank, Davao City | MONOLITHIC CONST & CONCRETE PRODUCTS INC | 100.00% | DPWH |
| 22LB0361 | Construction of Drainage at Purok 9, Duha Subd., Barangay 10-A, Davao City | MICAH CONST & SUPPLY | 100.00% | DPWH |
| 22LB0360 | Construction of Drainage at Purok 2 & 3 Albios Compound, Barangay Langub, Davao City | TWO DEGREES CONST AND SUPPLY | 100.00% | DPWH |
| 20LB0037 | Construction of Revetment along Davao River, Sta. 2+790 to Sta. 3+141, Davao City | ABU CONST | 100.00% | DPWH |
| 20LB0037 | Construction of Revetment along Davao River, Sta. 2+790 to Sta. 3+141, Davao City | ABU CONST | 100.00% | DPWH |
| 20LB0040 | Construction of Revetment along Davao River, Sta. 3+141 to Sta. 3+473, Davao City | RAKKI CORP / RELY CONST & SUPPLY INC FORMERLY: RELY CONST AND SUPPLY | 100.00% | DPWH |
| 20LB0040 | Construction of Revetment along Davao River, Sta. 3+141 to Sta. 3+473, Davao City | RAKKI CORP / RELY CONST & SUPPLY INC FORMERLY: RELY CONST AND SUPPLY | 100.00% | DPWH |
| 21LB0015 | Construction of Revetment along R. Magsaysay Ave. Outfall, Davao City (Sta. 0+000 - Sta. 0+100) | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0234 | Construction of Drainage System, Barangay Mandug, Davao City | LLM UNIFIED BUILDERS & TRADING CORP FORMERLY:LLM CONCRETE PRODUCTS | 100.00% | DPWH |
| 21LB0324 | Construction of Flood Mitigation Structure at Sasa Creek Outfall, Davao City | MONOLITHIC CONST & CONCRETE PRODUCTS INC | 100.00% | DPWH |
| 21LB0254 | Construction of Esplanade at Davao River, Right Bank, Bolton Bridge Downstream Section, Davao City | PRIMECON BUILDERS INC / ARCINUE COMM'L CORP | 100.00% | DPWH |
| 20LB0292 | Construction of Revetment along Davao River, Sta. 3+171 to Sta. 3+440, Davao City | ABU CONST | 100.00% | DPWH |
| 20LB0292 | Construction of Revetment along Davao River, Sta. 3+171 to Sta. 3+440, Davao City | ABU CONST | 100.00% | DPWH |
| 21LB0289 | Construction of Seawall at NHA Bangkal Relocation, Davao City | DREIRICH BUILDERS / THREE W BUILDERS INC | 100.00% | DPWH |
| 22LB0231 | Construction of Drainage System at Amparo Homes, Barangay Ilang, Davao City | WANGCON DEVELOPMENT CORP | 100.00% | DPWH |
| 22LB0197 | Construction of Drainage Canals, Colman to San Miguel, Centro (San Juan), Agdao District, Davao City | ROSBILL CONST AND SUPPLY | 100.00% | DPWH |
| 23LB0013 | Construction of Revetment along Talomo River, Puan Bypass Road Bridge Downstream Section, Left Bank, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0195 | Construction of Drainage Canal, Purok 12 to Davao River, Barangay Waan, Buhangin District, Davao City | CJEP BUILDERS AND ENGINEERING SERVICES | 100.00% | DPWH |
| 22LB0025 | Construction of Esplanade at Davao River, Right Bank Outfall Section, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0289 | Rehabilitation of Matina Pangi Creek Protecting Davao City Diversion Road (Saavedra Relocation Section, Left Bank) going to Matina River Outfall, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 23LB0142 | Construction of Revetment along Matina River protecting Matina Pangi Road, Sta. 7+500 to Sta. 7+800 Right Bank, Davao City | AGONG BUILDERS AND CONST SUPPLY INC / GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0352 | Construction of Flood Mitigation Structure along Catalunan Pequeño Creek, Wellspring Village Section, Right Bank, Talomo River, Davao City | GENESIS88 CONST INC / GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON | 100.00% | DPWH |
| 20LB0253 | Construction of Revetment along Matina River, Sta. 3+365 to Sta. 3+620, Davao City | ABU CONST | 100.00% | DPWH |
| 20LB0253 | Construction of Revetment along Matina River, Sta. 3+365 to Sta. 3+620, Davao City | ABU CONST | 100.00% | DPWH |
| 22LB0123 | Construction of Seawall at Bucana, Sta. 0+000 - Sta. 0+400, Brgy. Lasang, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0351 | Construction of Flood Mitigation Structure along Catalunan Pequeño Creek, Wellspring Village Section, Left Bank, Talomo River, Davao City | GENESIS88 CONST INC / GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON | 100.00% | DPWH |
| 22LB0293 | Construction of Revetment along Davao River, Barangay 8-A, Davao City | ARCINUE COMM'L CORP / MINDALIFI CONST AND SUPPLY | 100.00% | DPWH |
| 21LB0247 | Construction of Revetment along Talomo River, NHA Bangkal Section, Sta. 0+180 - Sta. 0+405, Left Bank, Davao City | KODUS PEERS CONST CORP / RELY CONST & SUPPLY INC FORMERLY: RELY CONST AND SUPPLY | 100.00% | DPWH |
| 20LB0036 | Construction of Revetment along Davao River, Sta. 1+095 to Sta. 1+543, Davao City | APEIRON CONST SOLUTIONS / ABU CONST | 100.00% | DPWH |
| 20LB0036 | Construction of Revetment along Davao River, Sta. 1+095 to Sta. 1+543, Davao City | APEIRON CONST SOLUTIONS / ABU CONST | 100.00% | DPWH |
| 22LB0033 | Construction of Flood Mitigation Structure along Bunawan River, Sta. 2 + 020 to Sta. 2 + 440, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 20LB0014 | Construction of Flood Mitigation Structure, Davao City Div Rd, La Verna Section, Davao City | RAKKI CORP / RELY CONST & SUPPLY INC FORMERLY: RELY CONST AND SUPPLY | 100.00% | DPWH |
| 20LB0014 | Construction of Flood Mitigation Structure, Davao City Div Rd, La Verna Section, Davao City | RAKKI CORP / RELY CONST & SUPPLY INC FORMERLY: RELY CONST AND SUPPLY | 100.00% | DPWH |
| 21LB0299 | Construction of Revetment along Matina River, Matina Pangi Downstream, Matina Pangi Section, Davao City | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 20LB0247 | Construction of Revetment along Davao River, Generoso Bridge Upstream Section, Right Bank, Davao City | RAKKI CORP | 100.00% | DPWH |
| 20LB0247 | Construction of Revetment along Davao River, Generoso Bridge Upstream Section, Right Bank, Davao City | RAKKI CORP | 100.00% | DPWH |
| 21LB0250 | Construction of Flood Mitigation Structure along Talomo River, Teacher's Village Section, Right Bank, Davao City | ARCINUE COMM'L CORP / MINDALIFI CONST AND SUPPLY | 100.00% | DPWH |
| 22LB0359 | Construction of Drainage at Puan to Purok 12 San Ignacio, Barangay Talomo Proper, Davao City | DELOUKRIS BUILDERS | 100.00% | DPWH |
| 21LB0305 | Construction of Drainage System leading to Tupaz Outfall, Davao City | RITZ BUILDERS CONST INC FORMERLY:RITZTOK CONST AND SUPPLY / ARCINUE COMM'L CORP | 100.00% | DPWH |
| 22LB0198 | Improvement of Drainage Canal, Purok 4 to Purok 8, Lapu-Lapu, Agdao District, Davao City | ROSBILL CONST AND SUPPLY | 100.00% | DPWH |
| 22LB0290 | Rehabilitation of Matina Pangi Creek Protecting Davao City Diversion Road (Saavedra Relocation Section, Right Bank) going to Matina River Outfall, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0432 | Construction of Revetment along Talomo River, Teachers Village Section, Davao City | MORTAR MASTERS & CONCRETE BUILDERS | 100.00% | DPWH |
| 22LB0124 | Rehabilitation of Drainage Structure along Mamay Creek, NHA Zone 2 Section, Sta. 0+000 - Sta. 1+790, Brgy. Buhangin, Davao City | JD SOMOZA BUILDERS | 100.00% | DPWH |
| 21LB0296 | Construction of Revetment along Talomo River, Sta. 3 + 542 to Sta. 3 + 817, Right Bank, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 23LB0074 | Construction of Revetment along Talomo River, Left Bank, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0196 | Construction of Drainage Canal, Purok 1, Barangay Bunawan, Davao City | LPS CONST GROUP INC | 100.00% | DPWH |
| 22LB0370 | Construction of Drainage System at Purok 6, 7 and 10, Barangay 8-A, Davao City | JB DANTE BUILDERS & SUPPLY | 100.00% | DPWH |
| 21LB0251 | Construction of Revetment along Talomo River, Sta. 3+542 to Sta. 3+747, Left Bank, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0356 | Construction of Drainage at Barangay Catalunan Pequeño, Davao City | C'ZARLES CONST & SUPPLY | 100.00% | DPWH |
| 22LB0365 | Construction of Drainage System at Department of Agrarian Reform, Catalunan Pequeño, Davao City | PRIMECON BUILDERS INC | 100.00% | DPWH |
| 22LB0349 | Construction of Flood Mitigation Structure along Catalunan Pequeño Creek, Left Bank, Talomo River, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0295 | Construction of Revetment along Davao River, Crocodile Park Section, Davao City | DREIRICH BUILDERS / THREE W BUILDERS INC | 100.00% | DPWH |
| 21LB0287 | Construction of Drainage System leading to Roxas Maindrain, Davao City | MITZ CONST AND SUPPLY / O G SANTOS CONST | 100.00% | DPWH |
| 21LB0310 | Construction Flood Mitigation Structure protecting Daang Maharlika (MN) at Brgy. Sasa, Davao City | RELY CONST & SUPPLY INC FORMERLY: RELY CONST AND SUPPLY | 100.00% | DPWH |
| 21LB0323 | Rehabilitation of Drainage Structure at Sasa Creek, Davao City | VICENTE T LAO CONST | 100.00% | DPWH |
| 22LB0375 | Rehabilitation of Drainage at Purok 25, Peoples Village, Barangay Maa, Davao City | VIBRANIUM BUILDERS CORP | 100.00% | DPWH |
| 22LB0232 | Construction of Drainage System at Diamond Street, Barangay Gov. Paciano Bangoy, Davao City | HEXAMINDZ CORP FORMERLY:KILUSANG MAGKAIBIG | 100.00% | DPWH |
| 22LB0031 | Construction of Revetment along R. Magsaysay Ave. Outfall, Sta. 0+100 - Sta. 0+200, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 20LB0291 | Construction of Revetment along Davao River, Sta. 3+065 to Sta. 3+440, Davao City | MITZ CONST AND SUPPLY | 100.00% | DPWH |
| 20LB0291 | Construction of Revetment along Davao River, Sta. 3+065 to Sta. 3+440, Davao City | MITZ CONST AND SUPPLY | 100.00% | DPWH |
| 22LB0030 | Construction of Revetment along Matina River, Sta. 6+207 - Sta. 6+440, Matina Pangi Br. 1 Upstream, Matina Pangi Section, Left Bank, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0350 | Construction of Flood Mitigation Structure along Catalunan Pequeño Creek, Right Bank, Talomo River, Davao City | GENESIS88 CONST INC | 100.00% | DPWH |
| 22LB0414 | Construction (Riprapping) of Canal from Deca Homes going to Country Homes up to the boundary of Barangay Communal, Barangay Cabantian, Buhangin District, Davao | MARK ANTHONY CONST & SUPPLY | 100.00% | DPWH |
| 22LB0366 | Construction of Drainage System at Jesus Soriano National High School, Barangay Catalunan Grande, Davao City | DICON BUILDERS CORP | 100.00% | DPWH |
| 22LB0372 | Construction of Flood Mitigation Structure at Purok 15, Kabataan Center Village, Barangay Bago Gallera, Davao City | A T DUMLAO CONST INC FORMERLYANDONI T D | 100.00% | DPWH |
| 22LB0364 | Construction of Drainage System at Catalunan Grande Elementary School, Barangay Catalunan Grande, Davao City | DINGO BUILDERS AND SUPPLY | 99.99% | DPWH |
| 23LB0011 | Construction of Revetment along Matina River, Asico Bridge Upstream Section, Right Bank, Davao City | GENESIS88 CONST INC | 99.93% | DPWH |
| 23LB0012 | Construction of Revetment along Matina River, Matina Pangi Road Section, Right Bank, Davao City | GENESIS88 CONST INC | 99.93% | DPWH |
| 21LB0012 | Construction of Davao River Flood Control, Davao City | VICENTE T LAO CONST | 99.82% | DPWH |
| 21LB0294 | Construction of Flood Mitigation Structure along Matina River, Sta. 1+460 - Sta. 1+667, Left Bank, Davao City | TKS BUILDERS & SUPPLIES / LEDCORE CONST AND DEVELOPMENT CORP | 99.67% | DPWH |
| 21LB0307 | Construction of Davao River Flood Control System, Davao City | MRD GEMPESAW CONST CORP / MONOLITHIC CONST & CONCRETE PRODUCTS INC | 98.91% | DPWH |
| 22LB0377 | Rehabilitation of Drainage System at Susana Homes Subdivision Section, Barangay Baliok, Talomo District, Davao City | H-ROYAL CONST | 98.49% | DPWH |
| 22LB0368 | Construction of Drainage System at Purok 3 Centro, Barangay Langub, Davao City | SNAS CONST AND SUPPLIES | 98.19% | DPWH |
| 21LB0297 | Construction of Flood Mitigation Structure at Purok 6, Bago Gallera, Talomo District, Davao City | A Y U ENGINEERING & CONST | 97.99% | DPWH |
| 21LB0293 | Construction of Revetment along Matina River, Outfall Section, Sta. 0+465 to Sta. 0+790, Left Bank, Davao City | MORTAR MASTERS & CONCRETE BUILDERS | 97.69% | DPWH |
| 22LB0374 | Rehabilitation of Drainage at Barangay Ma-a, Davao City | GRECO CONST AND SUPPLY | 97.00% | DPWH |
| 22LB0127 | Rehabilitation of Mamay Creek, Angliongto Section, Sta. 0+000 - Sta. 0+735, Brgy. Buhangin, Davao City | LANDEVTECH CONST INC / RELY CONST & SUPPLY INC FORMERLY: RELY CONST AND SUPPLY | 97.00% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Davao City District Engineering Office",
"nearAbc": 115,
"trigger": "office_pattern_aggregate",
"officeId": "0c4a6664-24f2-5cde-bf5b-b90337667c78",
"threshold": 0.995,
"binomialTailP": 4.5911316684149204e-11,
"nearAbcRatePct": 94.3,
"totalContracts": 122,
"baselineRatePct": 70.4,
"excessPctPoints": 23.9,
"expectedNearAbc": 85.9,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents
Cite this record
Love the Philippines. “Awards Very Close to the Budget Ceiling (C2).” Source: sumbong. Data as of October 22, 2026. https://lovethephilippines.com/risk/cc55c1f1-8a65-4f40-a2d8-15156a788505
The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.