Construction of Revetment along Matina River, Matina Pangi Bridge II Downstream, Both Banks, Davao City
Construction of Revetment along Matina River, Matina Pangi Bridge II Downstream, Both Banks, Davao City is a DPWH-tracked public work in DAVAO CITY (DAVAO DEL SUR), DAVAO DEL SUR, Region XI. Reported contract value: ₱188,175,000.00. Status: Reported complete (DPWH). Contractor on record: GENESIS88 CONST INC / ABU CONST. Figures trace to sumbong.
Total Contract Cost
