Construction of Flood Mitigation Structure24MI0029

Construction of M'lang River Flood Control Project (Upstream of M'lang Bridge, Left Side), Barangay Poblacion A, M'lang, Cotabato

Construction of M'lang River Flood Control Project (Upstream of M'lang Bridge, Left Side), Barangay Poblacion A, M'lang, Cotabato is a DPWH-tracked public work in M'LANG (COTABATO (NORTH COTABATO)), COTABATO (NORTH COTABATO), Region XII. Reported contract value: ₱86,849,999.38. Status: Reported complete (DPWH). Contractor on record: JARGON CONST & SUPPLY. Figures trace to sumbong.

M'LANG (COTABATO (NORTH COTABATO)), COTABATO (NORTH COTABATO), Region XII
Region: Region XII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱50,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXII-24-0016741 · ₱10,000,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24MI0029 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-10-18 → 2025-07-26

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Cotabato

Based on the coordinates published with the DPWH record and NOAH file Cotabato.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of M'lang River Flood Control Project (Upstream of M'lang Bridge, Left Side), Barangay Poblacion A, M'lang, Cotabato

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Balogo River ( Anick Section ) , Barangay Anick, Pigkawayan, North Cotabato
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-24-0016741

₱10,000,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXII-24-0003583

₱1,291,176.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXII-24-0003582

₱11,508,792.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXII-24-0003819

₱1,141,830.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXII-24-0007853

₱106,196.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXII-24-0007648

₱1,151,322.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

17 projects · ₱986.7M total · 2 flags

4. Implementation

Contract Amount

₱86,849,999.38

Progress

Reported complete (DPWH)

Start Date

February 19, 2024

Target End

December 8, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.