Roads16EF0032No coordinates published by DPWH

ROAD CONCRETING FROM NATIONAL HIGHWAY TO BRGY PROPER, BRGY ELVITA, NARRA

ROAD CONCRETING FROM NATIONAL HIGHWAY TO BRGY PROPER, BRGY ELVITA, NARRA is a DPWH-tracked public work in Palawan 2nd DEO, Region IV-B. Reported contract value: ₱1,960,161.77. Status: Reported complete (DPWH). Contractor on record: L&M RODRIGUEZ CONST AND TRADING INC FORMERLY: M M RODRIGUEZ TRADING AND CONST. Figures trace to dpwh.

Palawan 2nd DEO, Region IV-B

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region IV-B

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.74

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROI-16-0032325 · ₱179,406 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16EF0032 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD CONCRETING FROM NATIONAL HIGHWAY TO BRGY PROPER, BRGY ELVITA, NARRA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 74%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Porac River, Valdez Section, Floridablanca, Pampanga 2nd LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROI-16-0032325

₱179,406.00 · FY2016

Released to 00 - Don Mariano Marcos Memorial State University To cover (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

47 projects · ₱376.3M total · 0 flags

4. Implementation

Contract Amount

₱1,960,161.77

Progress

Reported complete (DPWH)

Start Date

April 6, 2016

Target End

August 13, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.