Roads18HG0015

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM; LOCAL ROADS AND BRIDGES; LOCAL ROADS - REHABILITATION OF ROAD, BRGY. PALANAS-CABIL-ISAN, ALCANTARA. CEBU

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM; LOCAL ROADS AND BRIDGES; LOCAL ROADS - REHABILITATION OF ROAD, BRGY. PALANAS-CABIL-ISAN, ALCANTARA. CEBU is a DPWH-tracked public work in Cebu 2nd DEO, Region VII. Reported contract value: ₱1,878,659.70. Status: Reported complete (DPWH). Contractor on record: WORLDWIDE BUILDERS. Figures trace to dpwh.

Cebu 2nd DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱1,500 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIVB-18-0019685 · ₱622,420 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18HG0015 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-09-09 → 2018-06-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM; LOCAL ROADS AND BRIDGES; LOCAL ROADS - REHABILITATION OF ROAD, BRGY. PALANAS-CABIL-ISAN, ALCANTARA. CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱1,500,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control, Brgy. Dumlog, Talisay, Cebu
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIVB-18-0019685

₱622,420.00 · FY2018

Released to Mabini National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

256 projects · ₱2.1B total · 4 flags

Other projects by this contractor

Construction of Dike along Kabalaasnan River, Dumanjug, Cebu

DUMANJUG (CEBU), CEBU, Region VII

2023₱96.5M
Reported complete (DPWH)

Construction of River Retaining Wall Structure at Sitio Upper Talayong, Barangay Tupas, Ronda, Cebu (Upstream)

RONDA (CEBU), CEBU, Region VII

2023₱96.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF RIVER CHANNEL IMPROVEMENT ALONG SITIO UPPER TALAYONG - SITIO LOWER T

Cebu 7th DEO, Region VII

2023₱75.8M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION/FLOOD MITIGATION STRUCTURE, BARANGAY PANALIPAN, CATMON, CEBU

Cebu 5th DEO, Region VII

2021₱71.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT BARANGAY KABALAASNAN (DOWNST

Cebu 7th DEO, Region VII

2024₱70.9M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL, PUROK LUBE, BARANGAY KABALAASNAN (DOWNSTR

Cebu 7th DEO, Region VII

2025₱70.9M
Past target date (DPWH On-Going)
View all 256 projects →

4. Implementation

Contract Amount

₱1,878,659.70

Progress

Reported complete (DPWH)

Start Date

February 20, 2018

Target End

March 6, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.