WORLDWIDE BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 256 linked DPWH project(s) totaling about ₱2,134,387,679.30. Recorded delivery grade A (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
WORLDWIDE BUILDERS
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 256
- Total value
- ₱2,134,387,679.30
- Published flags
- 4
- Region
- Cebu 2nd DEO · Region VII
Online presence
Google Maps: Worldwide Builders★ 3.8 (4 reviews)Google Maps, 2026-10-22
11 Dr Pablo U. Abella St, Cebu City, 6000 Cebu
Licensed officers (PCAB)
- Eric Go Ong · Authorized Managing Officer (PCAB license 31408) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for WORLDWIDE BUILDERS — not an accusation or finding of wrongdoing.
Score: 96.30 / 100 · Projects in sample: 256 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 95/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 95
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 247
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 255
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 98.8/100 · Weight: 21%
- totalProjects
- 256
- componentScore
- 98.8
- terminatedProjects
- 1
- terminationRatePct
- 0.4
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 256
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.6/100 · Weight: 11%
- projects
- 256
- componentScore
- 99.6
- flagsPerProject
- 0.01
- publishedV2Flags
- 3
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 256
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 44 of 208 geotagged projects (largest by contract value) — Open full map
- Construction of Dike along Kabalaasnan River, Dumanjug, Cebu23HO0128 · ₱96,498,225.85 · mapped
- Construction of River Retaining Wall Structure at Sitio Upper Talayong, Barangay Tupas, Ronda, Cebu (Upstream)23HO0141 · ₱96,302,851.43 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF RIVER CHANNEL IMPROVEMENT ALONG SITIO UPPER TALAYONG - SITIO LOWER T23HO0335 · ₱75,756,066.85 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION/FLOOD MITIGATION STRUCTURE, BARANGAY PANALIPAN, CATMON, CEBU21HI0010 · ₱71,261,484.40 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT BARANGAY KABALAASNAN (DOWNST23HO0291 · ₱70,939,564.65 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL, PUROK LUBE, BARANGAY KABALAASNAN (DOWNSTR25HO0004 · ₱70,937,516.95 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), POBLACION, ARGAO - USMAD - CANSUJE - LINUT-OD (VEGETABLE HIGHWAY) LEADING TO COAL MO21HG0066 · ₱61,606,738.38 · mapped
- Construction of Road Dike along Kabalaasnan River (Phase II), Dumanjug, Cebu23HO0049 · ₱48,997,477.13 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT PUROK LUBI, BARANGAY KABALAA23HO0263 · ₱48,014,639.32 · mapped
- CONCRETING/IMPROVEMENT OF LUKA-TUMALOG-CANANG ROAD SECTION, OSLOB, CEBU15HG0198 · ₱42,016,151.25
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF UPPER BECERRIL-SAN ANTON22HG0033 · ₱38,220,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD CONCRETING OF USMAD-CANSUJE-LINUT-OD LEADING TO COAL MOUNTAIN RANGE, ARGAO, CEBU19HG0205 · ₱37,180,456.46 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT BARANGAY KABALAASNAN (DOWNST24HO0157 · ₱33,293,571.26 · mapped
- CONSTRUCTION OF FLOOD CONTROL ALONG COTCOT RIVER, LILOAN, CEBU20HI0009 · ₱32,546,580.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET_PRESERVATION_PROGRAM; PREVENTIVE MAINTENANCE - TERTIARY ROADS - ARGAO-RONDA ROAD, RONDA, CEBU; SECTION 1: K0086+005-K0088+00018HG0036 · ₱29,454,774.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - CONCRETING OF BRGY. LUKA TO BRGY. TUMALOG ROAD LEADING TO TUMALOG FALLS, BRGY. LUKA, OSLOB, CEBU19HG0153 · ₱29,400,000.00 · mapped
- Construction of Looc Flood Control, Ginatilan, Cebu22HO0006 · ₱29,394,310.95 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - CONSTRUCTION OF CONCRETE ROAD, CONCRETING OF POBLACION-NUG-AS ROAD CONNECTING ALCOY AGRI-BUSINESS AND NATIONAL HIGHWAY IN SUPPORT19HG0155 · ₱27,901,789.45 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - NATALIO BACALSO AVENUE (CEBU SOUTH ROAD), PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY, SECTION 1: K0094+644 - K0095+100; SECTION19HG0129 · ₱27,899,725.21 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CONCRETING OF BRGY. NANGKA-SAN ANTONIO, BOLJOON, CEBU19HG0207 · ₱24,498,057.11 · mapped
- CONSTRUCTION OF DEP-ED SCHOOL BUILDING - FOUR (4) STOREY WITH EIGHT (8) CLASSROOMS AT GINATILAN INTEGRATED SCHOOL GINATILAN, CEBU20HG0178 · ₱23,380,800.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BATO FLOOD CONTROL (RIVER REVETMENT), SAMBOAN, CEBU18HG0077 · ₱23,272,532.30 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MALBOG, POBLACION, ALEGRIA, CEBU20HG0031 · ₱23,250,388.98 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CONCRETING OF POBLACION, ARGAO - USMAD-CANSUJE-LINUT-OD (VEGETABLE HIGHWAY) LEADING TO COAL MOUNTAIN RANGE, ARGAO, CEBU20HG0047 · ₱23,250,357.80 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), CONCRETING OF BARANGAY CAWAYAN, LANAO AND SITIO BAYUG TO BAT COLONY 2, DALAGUETE, CEBU21HG0053 · ₱23,246,663.60 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF POBLACION FLOOD CONTROL, RONDA, CEBU18HG0120 · ₱20,432,932.70 · mapped
- LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/IMPROVEMENT OF MUNICIPAL AND BRGY. ROAD, POBLACION, SANTANDER, CEBU20HG0102 · ₱18,790,200.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, PALANAS FARM AND RESORT - DAYHAG FALLS, BOLJOON, CEBU20HG0046 · ₱18,599,988.65 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, BARANGAY LUKA-BARANGAY TUMALOG ROAD LEADING TO TUMALOG FALLS, BRGY. LUKA, OSLOB, CEBU20HG0075 · ₱18,599,720.60 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - CONSTRUCTION OF LAGNASON RIVER FLOOD CONTROL STRUCTURE (UPSTREAM) ALONG NA19HG0046 · ₱18,580,418.21 · mapped
- CONSTRUCTION OF 2-STOREY 8-CL SCHOOL BUILDING, CANSUJE ES, ARGAO, CEBU17HG0208 · ₱16,974,245.00
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM; OFF-CARRIAGEWAY IMPROVEMENT-SECONDARY ROAD, SANTANDER-BARILI-TOLEDO ROAD; SECTION 1: K0180+503-K0181+600; SECTION 2: K0183+500-K0184+104; SECTION 3: K01818HG0093 · ₱15,708,037.80 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - ROAD CONSTRUCTION UPPER BECERRIL, BOLJOON, CEBU22HG0002 · ₱14,849,500.00 · mapped
- LOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF BUSAY-AGBALANGA-BATADBATAD ROAD AT BRGYS. BUSAY, AGBALANGA AND BATADBATAD, MOALBOAL, CEBU20HG0146 · ₱14,385,027.60 · mapped
- LOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, IMPROVEMENT/CONCRETING OF LEPANTO CERDEÑA ROAD, BRGYS. LEPANTO, ALEGRIA AND BRGY. CERDEÑA, MALABUYOC, CEBU20HG0112 · ₱14,376,320.10 · mapped
- LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF NANGKA, BOLJOON-CERDEÑA ROAD, BOLJOON, CEBU20HG0106 · ₱14,371,473.37 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - CONCRETING OF DUYAN-DUYAN TOURISM CIRCUMFERENTIAL ROAD LEADING TO DUYAN-DUYAN CAVE, SANTANDER, BRGY. CABUTONGAN, SANTANDER, CEBU19HG0092 · ₱13,936,086.92 · mapped
- RETROFITTING/STRENGTHENING OF TAPON BRIDGE I (B00429CB), K0216+864 ALONG SANTANDER-BARILI-TOLEDO ROAD17HG0096 · ₱12,039,288.40
- LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM; BUILDINGS AND OTHER STRUCTURES; MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, CEBU TECHNOLOGICAL UNIVERSITY - GINATILAN EXTENSION CAMPUS, BRGY. SAN ROQUE, GINATILAN, CEBU20HG0158 · ₱11,874,461.01 · mapped
- CONCRETING OF BRGY. NANGKA FMR (LEADING TO BRGY. LEPANTO, ALEGRIA, CEBU) BRGY. NANGKA, BOLJOON, CEBU21HG0172 · ₱11,807,130.91 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD AT BARANGAY MANLAPAY,22HG0006 · ₱11,759,345.17 · mapped
- CONSTRUCTION OF 2-STOREY 6-CL SCHOOL BUILDING (BLDG. 1), BUNLAN ES, SANTANDER, CEBU17HG0177 · ₱11,645,000.00
- CONSTRUCTION OF 2-STOREY 6-CL SCHOOL BUILDING (BLDG. 2), BUNLAN ES, SANTANDER, CEBU17HG0178 · ₱11,645,000.00
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CONCRETING OF ACCESS ROAD LEADING TO SAN ANTONIO, BOLJOON (AGRI-ECO TOURISM ROUTE), CEBU19HG0203 · ₱10,694,588.55 · mapped
- LOCAL PROGRAM, LOCAL_ROADS_AND_BRIDGES, LOCAL ROADS, CONSTRUCTION OF CONCRETE ROAD - ROAD CONCRETING OF NANGKA-LEPANTO ROAD, BOLJOON, CEBU19HG0135 · ₱9,900,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD_MANAGEMENT_PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BATO, SAN SEBASTIAN SEAWALL, BATO, SAMBOAN, CEBU19HG0102 · ₱9,800,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), POBLACION, ARGAO-USMAD-CANSUJE-LINUT-OD (VEGETABLE HIGHWAY) LEADING TO COAL MOUNTAIN22HG0039 · ₱9,800,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, PALANAS FARM AND RESORT ROAD CONNECTING TO DAYHAG FALLS, BOLJOON, CEBU19HG0200 · ₱9,799,866.79 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF GUIWANON SEAWALL, ARGAO, CEBU19HG0195 · ₱9,798,967.25 · mapped
- CONCRETING OF GUTLANG-ALAMBIJUD FMR, BRGY. GUTLANG, ARGAO, CEBU16HG0035 · ₱9,645,722.80
Across government
- DepEd Infrastructure: 1 award · ₱7,464,923.70
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
