Water Provision and Storage23NG0136

CONSTRUCTION OF SOLAR WATER SUPPLY SYSTEM/SISON, SURIGAO DEL NORTE

CONSTRUCTION OF SOLAR WATER SUPPLY SYSTEM/SISON, SURIGAO DEL NORTE is a DPWH-tracked public work in Surigao del Norte 2nd DEO, Region XIII. Reported contract value: ₱9,799,884.16. Status: Past target date (DPWH On-Going). Contractor on record: EL-JAKE BUILDERS. Figures trace to dpwh.

Surigao del Norte 2nd DEO, Region XIII
Region: Region XIII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱50,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23NG0136 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    96% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF SOLAR WATER SUPPLY SYSTEM/SISON, SURIGAO DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Magallanes River, Brgy. Lahi, Gigaquit, Surigao del Norte
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Surigao del Norte 2nd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

117 projects · ₱1.9B total · 1 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF FLOOD CONTROL STRUCTURE ALONG KALERO RIVER, BRGY. SAN RAFAEL, NOVELETA, CAV

Cavite 1st DEO, Region IV-A

2024₱100.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG YLANG-YLANG RIVER, BARANGAY SANTA ISABEL,KAWIT

Cavite 1st DEO, Region IV-A

2024₱95.5M
Past target date (DPWH On-Going)
No sat.

REHABILITATION OF MULTI-PURPOSE BUILDING WITHIN ZONE 58 TO 67, MANILA CITY (PHASE III)

North Manila DEO, National Capital Region

2025₱78.9M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURES, SITIO KAPATAGAN TO BOSO-BOSO RIVER (DOWNSTREAM PHASE 2), K0035+900 ALONG MARIKINA-INFANTA ROAD ANTIPOLO CITY, RIZAL (SECOND DISTRICT)

Rizal 1st DEO, Region IV-A

2020₱55.0M
Reported complete (DPWH)
No sat.

IMPROVEMENT/CONSTRUCTION OF FLOOD CONTROL STRUCTURES, SITIO KAPATAGAN RIVER (UPSTREAM PHASE 7), K0035+900 ALONG MARIKINA-INFANTA ROAD, ANTIPOLO CITY (SECOND DISTRICT)

Rizal 1st DEO, Region IV-A

2019₱55.0M
Reported complete (DPWH)
No sat.

Construction of Flood Control and Slope Protection Structure along Upper Marikina River, Barangay San Jose, Rodriguez, Rizal

MONTALBAN (RIZAL), RIZAL, Region IV-A

2023₱48.2M
Reported complete (DPWH)
View all 117 projects →

4. Implementation

Contract Amount

₱9,799,884.16

Progress

Past target date (DPWH On-Going)

Start Date

March 15, 2024

Target End

September 18, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.