Roads21HG0033

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF THE STA. FILOMENA - VALENCIA ROAD AT BARANGAY STA. FILOMENA & VALENCIA, ALEGRIA, CEBU

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF THE STA. FILOMENA - VALENCIA ROAD AT BARANGAY STA. FILOMENA & VALENCIA, ALEGRIA, CEBU is a DPWH-tracked public work in Cebu 2nd DEO, Region VII. Reported contract value: ₱3,838,941.56. Status: Reported complete (DPWH). Contractor on record: WORLDWIDE BUILDERS. Figures trace to dpwh.

Cebu 2nd DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱23,100 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21HG0033 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-06-04 → 2018-06-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF THE STA. FILOMENA - VALENCIA ROAD AT BARANGAY STA. FILOMENA & VALENCIA, ALEGRIA, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱23,100,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control, Cansojong, Talisay, Cebu
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Cebu 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

256 projects · ₱2.1B total · 4 flags

Other projects by this contractor

Construction of Dike along Kabalaasnan River, Dumanjug, Cebu

DUMANJUG (CEBU), CEBU, Region VII

2023₱96.5M
Reported complete (DPWH)

Construction of River Retaining Wall Structure at Sitio Upper Talayong, Barangay Tupas, Ronda, Cebu (Upstream)

RONDA (CEBU), CEBU, Region VII

2023₱96.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF RIVER CHANNEL IMPROVEMENT ALONG SITIO UPPER TALAYONG - SITIO LOWER T

Cebu 7th DEO, Region VII

2023₱75.8M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION/FLOOD MITIGATION STRUCTURE, BARANGAY PANALIPAN, CATMON, CEBU

Cebu 5th DEO, Region VII

2021₱71.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT BARANGAY KABALAASNAN (DOWNST

Cebu 7th DEO, Region VII

2024₱70.9M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL, PUROK LUBE, BARANGAY KABALAASNAN (DOWNSTR

Cebu 7th DEO, Region VII

2025₱70.9M
Past target date (DPWH On-Going)
View all 256 projects →

4. Implementation

Contract Amount

₱3,838,941.56

Progress

Reported complete (DPWH)

Start Date

February 17, 2021

Target End

April 27, 2021

5. Audit