Buildings and Facilities17GG0160No coordinates published by DPWH

CONSTRUCTION OF ONE (1) UNIT - ONE (1) STOREY TWO (2) CLASSROOMS, SAN JULIAN ES, CALINOG, ILOILO

CONSTRUCTION OF ONE (1) UNIT - ONE (1) STOREY TWO (2) CLASSROOMS, SAN JULIAN ES, CALINOG, ILOILO is a DPWH-tracked public work in Iloilo 2nd DEO, Region VI. Reported contract value: ₱2,231,636.68. Status: Reported complete (DPWH). Contractor on record: EZ GOLD CONST. Figures trace to dpwh.

Iloilo 2nd DEO, Region VI

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region VI

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱39,030 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIVB-17-0025289 · ₱1,049,184 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17GG0160 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,115,818 per classroom= 0.8x the Region VI median (n=296)

Contract cost ₱2,231,637 ÷ 2 classroom read from the DPWH title (“TWO (2) CLASSROOMS”; classroom count in title). National percentile: 9. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ONE (1) UNIT - ONE (1) STOREY TWO (2) CLASSROOMS, SAN JULIAN ES, CALINOG, ILOILO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱39,030,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
(Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers), along Jalaur River, Brgy. Imbang Pequeño, Sta. 0+000 - Sta. 0+359, San Enrique, Iloilo
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-17-0025289

₱1,049,184.00 · FY2017

Released to Marinduque Distr Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱2,231,636.68

Progress

Reported complete (DPWH)

Start Date

November 29, 2017

Target End

February 21, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.