Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Southern Leyte 1st District Engineering Office awarded 48 of 50 recorded flood-control contracts (96.0%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (25.6 percentage points higher; binomial p = 5.7e-06), across 24 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This could be due to highly competitive bidding or very precise cost estimates.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Southern Leyte 1st District Engineering Office: contracts
48 of 50 contracts (96%) at ≥99.5% of ABC · peer baseline 70.4% · gap +25.6 pts · binomial p = 5.7e-6. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 22IL0079 | Construction of Basak River Control, Barangay Basak, Maasin City, Southern Leyte | 3MC KING CIVIL ENGINEERING CONST | 101.02% | DPWH |
| 23IL0006 | Construction of Flood Control Structure, Barangay Bogo Gotosan, Maasin City, Southern Leyte | DAV-LEY CONST SERVICES INC FORMERLY:DAV-LEY CONST SERVICES | 101.02% | DPWH |
| 21IL0134 | Construction of Road Slope Protection along Road Leading to Limasawa Heritage Site, Limasawa, Southern Leyte | B VICENCIO BUILDERS BVB INC FORMERLY:B VICENCIO CONST / JGO BUILDERS | 100.00% | DPWH |
| 22IL0062 | Construction of Lawigan Flood Control along Jct Himay-angan - Silago - Abuyog - Bdry. Road, St. Bernard, Southern Leyte | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 22IL0102 | Construction of Slope Protection Structure along Son-ok Manglit Section, Pintuyan, So. Leyte | COLLERA CONST | 100.00% | DPWH |
| 24IL0013 | Construction of Bogo Flood Control Segment 2, Maasin City, Southern Leyte | B VICENCIO BUILDERS BVB INC FORMERLY:B VICENCIO CONST / JGO BUILDERS | 100.00% | DPWH |
| 23IL0040 | Construction of Canturing Flood Structures, Canturing River, Maasin City, Southern Leyte | JQD CONST & GEN SERVICES | 100.00% | DPWH |
| 22IL0135 | Construction of Cat-iwing Flood Control Structure, Hinundayan, Southern Leyte | LANOY CONST | 100.00% | DPWH |
| 21IL0140 | Construction of Road Slope Protection along Liloan, Southern Leyte | MORTAR MASTERS & CONCRETE BUILDERS / JM COLLERA KONSTRACT | 100.00% | DPWH |
| 22IL0099 | Construction of Das-ay Flood Control, Hinunangan, Southern Leyte | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 100.00% | DPWH |
| 21IL0137 | Construction of Slope Protection along Padre Burgos, Southern Leyte | S-ANG CONST & GEN TRADING INC / MORTAR MASTERS & CONCRETE BUILDERS | 100.00% | DPWH |
| 21IL0133 | Construction of Road Slope Protection along Ichon-Sindangan-Guinabonan-Maningning Road, Southern Leyte | S-ANG CONST & GEN TRADING INC / MORTAR MASTERS & CONCRETE BUILDERS | 100.00% | DPWH |
| 24IL0009 | Construction of Malbago Flood Control Segment 2, Bontoc, Southern Leyte | ON POINT CONST AND DEVELOPMENT CORP FORMERLY:ON POINT CONST | 100.00% | DPWH |
| 22IL0029 | Construction of Catublian Flood Control, Hinunangan, Southern Leyte | ST TIMOTHY CONST CORP | 100.00% | DPWH |
| 24IL0019 | Construction of Baugo Flood Control Structure, Bontoc, Southern Leyte | FAIRCHILD BUILDERS & DEVELOPERS INC / ZTATIK BUILDER INC | 100.00% | DPWH |
| 22IL0030 | Construction of Patong Flood Flood Control, Hinunangan, Southern Leyte | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 100.00% | DPWH |
| 22IL0024 | Construction of Amparo Flood Control, Macrohon, Southern Leyte | ON POINT CONST AND DEVELOPMENT CORP FORMERLY:ON POINT CONST | 100.00% | DPWH |
| 22IL0074 | Construction of Kawayan Flood Control, Libagon, Southern Leyte | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 100.00% | DPWH |
| 22IL0091 | Construction of Slope Protection Structure along Ichon-Sindanga-Guinabonan-Maningning Road, Southern Leyte | COLLERA CONST | 100.00% | DPWH |
| 21IL0139 | Construction of Road Slope Protection along Maasin Bypass Road, Maasin City, Southern Leyte | A C RIVERO DEVELOPMENT CORP | 100.00% | DPWH |
| 24IL0021 | Construction of Canturing Mambajao Section Flood Control Structure, Maasin City, Southern Leyte | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 24IL0022 | Construction of Caaga - San Jose Flood Control Structure, Malitbog, Southern Leyte | JDR CONST / JGO BUILDERS | 100.00% | DPWH |
| 22IL0118 | Construction of Road Slope Protection along Rizal-Aguban Road, Tomas Oppus, Southern Leyte | JGO BUILDERS | 100.00% | DPWH |
| 22IL0117 | Construction of Road Slope Protection along Nonok Norte, Maasin City, Southern Leyte | JGO BUILDERS | 100.00% | DPWH |
| 22IL0107 | Construction of Subangdaku Flood Control (Suba - Kanangkaan Section), Sogod, Southern Leyte | PABLO S LABASBAS CONST CORP FORMERLY: PABLOS LABASBAS CONST CORP | 100.00% | DPWH |
| 22IL0106 | Construction of Talisay Flood Control, Libagon, Southern Leyte | JQD CONST & GEN SERVICES | 100.00% | DPWH |
| 23IL0055 | Construction of Bato 1 - Bato 2 Flood Control, Maasin City, Southern Leyte | ON POINT CONST AND DEVELOPMENT CORP FORMERLY:ON POINT CONST / UKC BUILDERS INC | 100.00% | DPWH |
| 22IL0025 | Construction of Bato I Flood Control, Bato I, Maasin City, Southern Leyte | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 100.00% | DPWH |
| 22IL0100 | Construction of Maag Flood Flood Control, Silago, Southern Leyte | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 99.99% | DPWH |
| 23IL0012 | Construction of Shoreline Protection Structure - Bdry. So. Leyte - Maasin - Macrohon - Sogod - Jct. Daang Maharlika Rd. - along Maasin City Section, Maasin City | ST TIMOTHY CONST CORP | 99.97% | DPWH |
| 22IL0173 | Construction of Barangay Combado Flood Control Structure, Maasin City, Southern Leyte | ON POINT CONST AND DEVELOPMENT CORP FORMERLY:ON POINT CONST / UKC BUILDERS INC | 99.95% | DPWH |
| 22IL0071 | Construction of Guinsangaan Flood Control, Bontoc, Southern Leyte | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP | 99.93% | DPWH |
| 23IL0010 | Construction of Shoreline Protection Structure - Newly Converted National Road - along Limasawa Circumferential Road, Limasawa, Southern Leyte | PABLO S LABASBAS CONST CORP FORMERLY: PABLOS LABASBAS CONST CORP | 99.93% | DPWH |
| 22IL0089 | Construction of Slope Protection Structure along Limasawa Circumferential Road, Limasawa, Southern Leyte | COLLERA CONST | 99.92% | DPWH |
| 23IL0014 | Construction of Shoreline Protection Structure - Bdry. So. Leyte - Maasin - Macrohon - Sogod - Jct. Daang Maharlika Rd. - along Macrohon Section, Macrohon, Sout | ST TIMOTHY CONST CORP | 99.90% | DPWH |
| 22IL0126 | Construction of Himakilo Flood Control Structure, Bontoc, Southern Leyte | UNIMASTERS CONGLOMERATION INC | 99.89% | DPWH |
| 22IL0104 | Construction of Combado Flood Control, Combado, Maasin City, Southern Leyte | ON POINT CONST AND DEVELOPMENT CORP FORMERLY:ON POINT CONST | 99.88% | DPWH |
| 24IL0064 | Construction of Canturing River Flood Control, Brgy. Nasaug, Segment 2, Maasin City, Southern Leyte | JQD CONST & GEN SERVICES | 99.88% | DPWH |
| 24IL0007 | Construction of Sta. Sofia Flood Control, Padre Burgos, Southern Leyte | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 99.88% | DPWH |
| 22IL0087 | Construction of Canturing Flood Control, Canturing, Maasin City, Southern Leyte | JQD CONST & GEN SERVICES | 99.88% | DPWH |
| 22IL0128 | Construction of Tuburan Flood Control Structure, Tunga-Tunga, Maasin City, Southern Leyte | AMB ENT | 99.87% | DPWH |
| 24IL0023 | Construction of Beniton Flood Control Segment 2, Bontoc, Southern Leyte | FAIRCHILD BUILDERS & DEVELOPERS INC | 99.87% | DPWH |
| 22IL0080 | Construction of Canturing Flood Control (Canturing-Nasaug Section), Maasin City, Southern Leyte | JQD CONST & GEN SERVICES | 99.86% | DPWH |
| 24IL0057 | Construction of Basak River Control, Basak, Maasin City, Southern Leyte | PABLO S LABASBAS CONST CORP FORMERLY: PABLOS LABASBAS CONST CORP | 99.84% | DPWH |
| 22IL0081 | Construction of Jubas Flood Control, Libagon, Southern Leyte | JQD CONST & GEN SERVICES | 99.84% | DPWH |
| 24IL0059 | Construction of San Jose Flood Control, San Jose, Maasin City, Southern Leyte | DAV-LEY CONST SERVICES INC FORMERLY:DAV-LEY CONST SERVICES | 99.82% | DPWH |
| 22IL0086 | Construction of Reinforced Concrete Culvert (RCBC) Brgy. Sto. Niño, Macrohon, Southern Leyte | 3MC KING CIVIL ENGINEERING CONST | 99.73% | DPWH |
| 23IL0043 | Construction of Flood Control Structures in Barangay Bato 1 to 2, Maasin City, Southern Leyte | DAV-LEY CONST SERVICES INC FORMERLY:DAV-LEY CONST SERVICES | 99.62% | DPWH |
| 22IL0077 | Construction of Basak - Tuburan River Control, Maasin City, Southern Leyte | APTJ CONST SERVICES | 99.48% | DPWH |
| 22IL0037 | Construction of Bogo Flood Control, Sitio Gutosan, Maasin City, Southern Leyte | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 99.39% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Southern Leyte 1st District Engineering Office",
"nearAbc": 48,
"trigger": "office_pattern_aggregate",
"officeId": "f1938c4e-ca00-50e5-8d41-aa272f2ff2b2",
"threshold": 0.995,
"binomialTailP": 0.000005708032838301131,
"nearAbcRatePct": 96,
"totalContracts": 50,
"baselineRatePct": 70.4,
"excessPctPoints": 25.6,
"expectedNearAbc": 35.2,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents
Possible Innocent Explanations
- This could be due to highly competitive bidding or very precise cost estimates.