Construction of Flood Mitigation Structure22IL0100

Construction of Maag Flood Flood Control, Silago, Southern Leyte

Construction of Maag Flood Flood Control, Silago, Southern Leyte is a DPWH-tracked public work in SILAGO (SOUTHERN LEYTE), SOUTHERN LEYTE, Region VIII. Reported contract value: ₱48,994,280.63. Status: Reported complete (DPWH). Contractor on record: ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP. Figures trace to sumbong.

SILAGO (SOUTHERN LEYTE), SOUTHERN LEYTE, Region VIII
Region: Region VIII

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱50,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱48,967,124 · ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-06-14 → 2019-06-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Southern Leyte

Based on the coordinates published with the DPWH record and NOAH file SouthernLeyte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Maag Flood Flood Control, Silago, Southern Leyte

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Maag Flood Flood Control, Silago, Southern Leyte
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Southern Leyte 1st District Engineering Office · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

22IL0100 (CONSTRUCTION/ MAINTENANCE OF FLOOD MITIG

₱48,967,123.75 · ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP

Award / contract ref: 22IL0100

Contractor

B

61 projects · ₱4.8B total · 15 flags

4. Implementation

Contract Amount

₱48,994,280.63

Progress

Reported complete (DPWH)

Start Date

February 16, 2022

Target End

October 13, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)Southern LeyteSilagoPob. District I
Storms whose wind field reached it
Penha 2026Nokaen 2026Koto 2025Kalmaegi 2025Bualoi 2025
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.