Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 24CA0048 was awarded at 100.00% of its ABC. Across its 26 recorded contracts, M C J VALENZUELA CONST ENT was awarded at ≥99.5% of ABC 24 times (92.3%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or competitive bidding that matched the ABC exactly.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Project along Pulo-Almacen River, Phase IV-DMC, Hermosa, Bataan24CA0048Flood control | 100% | January 5, 2025 | December 3, 2024 | No target date from DPWH, so lateness cannot be computed | completedsumbong source |
Start: April 23, 2024 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Bataan 1st District Engineering Office",
"ratio": 1,
"abcPhp": 96499999.74,
"threshold": 0.995,
"contractId": "24CA0048",
"contractor": "M C J VALENZUELA CONST ENT",
"contractCostPhp": 96499999.74
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
- This may be due to precise cost estimation or competitive bidding that matched the ABC exactly.
Cite this record
Love the Philippines. “Awards Very Close to the Budget Ceiling (C2): Construction of Flood Control Project along Pulo-Almacen River, Phase IV-DMC, Hermosa, Bataan.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/0b52feb1-a9da-4c88-9e6a-cb07353b1231
The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.