Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Cross-Source Mismatch (PhilGEPS vs DPWH)

Linked PhilGEPS award amount or awardee disagrees with Sumbong contract row.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: PhilGEPS award 23CA0039 lists ₱47.90M to M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES, while DPWH records contract 23CA0039 at ₱49.00M to M C J VALENZUELA CONST ENT. The difference may reflect a variation order or a data-entry difference between the two systems.

Public record entityConstruction of Flood Control Structure along Tuyo River, Abucay Section (Phase II-AA), Abucay, Bataan
LocationABUCAY (BATAAN), BATAAN, Region IIIContract 23CA0039
Amount₱48,999,991.82 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure along Tuyo River, Abucay Section (Phase II-AA), Abucay, Bataan23CA0039Flood control100%January 4, 2024December 28, 2023—completedsumbong source

Start: April 27, 2023 · Source fetched October 21, 2026

Rule Definition

Compares linked award and project contractor/cost above tolerance.

Triggering Data & citations

Linked PhilGEPS award fields disagree with DPWH/Sumbong contract record

{
  "linkId": "641e05b1-e5c5-49b4-be59-718a5f78e1da",
  "awardId": "8a6f8610-29bd-41fc-b931-54755f4d0c62",
  "linkScore": 1,
  "nameMismatch": true,
  "amountMismatch": false,
  "awardAmountPhp": "47898528.84",
  "projectCostPhp": "48999991.82",
  "philgepsAwardee": "M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES"
}

Possible Innocent Explanations

  • Scope change after award
  • JV name vs subsidiary on contract
  • The difference may reflect a variation order or a data-entry difference between the two systems.