Cross-Source Mismatch (PhilGEPS vs DPWH)
Linked PhilGEPS award amount or awardee disagrees with Sumbong contract row.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: PhilGEPS award 23CA0039 lists ₱47.90M to M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES, while DPWH records contract 23CA0039 at ₱49.00M to M C J VALENZUELA CONST ENT. The difference may reflect a variation order or a data-entry difference between the two systems.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Tuyo River, Abucay Section (Phase II-AA), Abucay, Bataan23CA0039Flood control | 100% | January 4, 2024 | December 28, 2023 | — | completedsumbong source |
Start: April 27, 2023 · Source fetched October 21, 2026
Rule Definition
Compares linked award and project contractor/cost above tolerance.
Triggering Data & citations
Linked PhilGEPS award fields disagree with DPWH/Sumbong contract record
{
"linkId": "641e05b1-e5c5-49b4-be59-718a5f78e1da",
"awardId": "8a6f8610-29bd-41fc-b931-54755f4d0c62",
"linkScore": 1,
"nameMismatch": true,
"amountMismatch": false,
"awardAmountPhp": "47898528.84",
"projectCostPhp": "48999991.82",
"philgepsAwardee": "M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES"
}Source documents
Possible Innocent Explanations
- Scope change after award
- JV name vs subsidiary on contract
- The difference may reflect a variation order or a data-entry difference between the two systems.