Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23GI0066 was awarded at 100.00% of its ABC. Across its 22 recorded contracts, IBC INTERNATIONAL BUILDERS CORP was awarded at ≥99.5% of ABC 21 times (95.5%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or competitive bidding that matched the ABC exactly.

Public record entityConstruction of Buntatala Flood Control Project, Brgy. Buntatala, Leganes, Iloilo
LocationLEGANES (ILOILO), ILOILO, Region VIContract 23GI0066
Amount₱96,524,109.64100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Buntatala Flood Control Project, Brgy. Buntatala, Leganes, Iloilo23GI0066Flood control100%May 24, 2024May 24, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 4, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Iloilo 4th District Engineering Office",
  "ratio": 0.9999907758611759,
  "abcPhp": 96525000,
  "threshold": 0.995,
  "contractId": "23GI0066",
  "contractor": "IBC INTERNATIONAL BUILDERS CORP",
  "contractCostPhp": 96524109.64
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to precise cost estimation or competitive bidding that matched the ABC exactly.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)IloiloLeganesCari Mayor
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025Bualoi 2025
Hazard exposure
Active fault15.9 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)lowUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA3 (4.01-5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.