Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 22, 2026

High Concurrent Workload for One Contractor

Contractor linked to many simultaneous projects or very high total value vs peers.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: M3 KONSTRACT CORP FORMERLY:MARGARITA CONST holds 38 flood-control contracts worth ₱3.07B, 3.02× the 95th-percentile contractor total (₱1.01B); up to 18 ran at the same time. This is a capacity question worth examining. The contractor may simply be highly capable or preferred for large-scale projects.

Public record entityM3 KONSTRACT CORP FORMERLY:MARGARITA CONSTOrganization record →
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 38Ongoing: 0Delayed: 0Status unknown: 0
Show 32 more projects in this bucket
Construction of Flood Control Structure along NCR/ Bulacan Bdry.-Bigte-Ipo Dam Road Ilog Bayan River, San Jose Del Monte City, Bulacan23CD0064Flood control100%December 29, 2023December 5, 2023—completedsumbong source
Construction of Flood Control Structure at Barangay San Roque, Baliuag, Bulacan (K001+600 to K001+900)23CC0282Flood control100%December 22, 2023December 18, 2023—completedsumbong source
Construction of Flood Control Structure at Barangay Sulivan, Baliuag, Bulacan (K003+821 to K004+121)23CC0278Flood control100%February 20, 2024February 20, 2024—completedsumbong source
Construction of Flood Control Structure at Barangay Tilapayong, Baliuag, Bulacan (K000+761 to K000+972.2)23CC0370Flood control100%December 28, 2023November 9, 2023—completedsumbong source
Construction of Flood Control Structure Mag-asawang Sapa Creek, San Ildefonso, Bulacan Phase 223C00191Flood control100%January 30, 2024January 30, 2024—completedsumbong source
Construction of Flood Control Structure San Jose-Bintog Tributaries of Angat River, Plaridel, Bulacan23CC0052Flood control100%December 2, 2023December 2, 2023—completedsumbong source
Construction of Flood Control Structure, Barangay Hinukay, Baliuag, Bulacan22CC0293Flood control100%January 29, 2023January 29, 2023—completedsumbong source
Construction of Flood Control Structure, Ilog Bayan River, San Jose Del Monte City, Bulacan24CD0055Flood control100%December 13, 2024November 18, 2024—completedsumbong source
Construction of Flood Control Structure, Ilog Bayan River, San Jose Del Monte City, Bulacan23CD0066Flood control100%December 29, 2023December 5, 2023—completedsumbong source
Construction of Flood Control Structure, Santa Maria River and its tributaries (Bagbaguin-Bolacan), Bagbaguin, Santa Maria, Bulacan23CD0121Flood control100%March 31, 2024March 31, 2024—completedsumbong source
Construction of Reinforced Concrete Flood Control Structure at Barangay Piel (Purok 3 to Purok 5), Baliuag, Bulacan24CC0169Flood control100%October 24, 2024October 24, 2024—completedsumbong source
Construction of Reinforced Concrete Flood Control Structure at Barangay San Roque (Purok 1 to Purok 3), Baliuag, Bulacan24CC0167Flood control100%October 24, 2024October 24, 2024—completedsumbong source
Construction of Reinforced Concrete Flood Control Structure at Barangay San Roque (Purok 3 to Purok 5), Baliuag, Bulacan24CC0170Flood control100%October 24, 2024October 24, 2024—completedsumbong source
Construction of River Control Project along Angat River, Tiaong Section. Sta. 08+370 to Sta. 08+700, Baliuag, Bulacan23CC0083Flood control100%February 7, 2024February 7, 2024—completedsumbong source
Construction of River Control Project at Barangay Hinukay, Sta. 01+960 to Sta. 02+360, Baliuag, Bulacan23CC0132Flood control100%December 9, 2023December 9, 2023—completedsumbong source
Construction of Riverwall along Angat River, Tiaong Section, Sta. 08+710 to Sta. 09+040, Baliuag, Bulacan23CC0082Flood control100%February 7, 2024August 28, 2023—completedsumbong source
Construction of Riverwall at Barangay Hinukay, Sta. 02+370 to Sta. 02+770, Baliuag, Bulacan23CC0134Flood control100%December 9, 2023December 9, 2023—completedsumbong source
Construction of Slope Protection along Tumana Creek, Brgy. Tumana, Marikina City24OB0253Flood control100%February 13, 2025February 13, 2025—completedsumbong source
Improvement Works Along Upper Marikina River at Sta. 15 + 700 to Sta. 15 + 850, Right Bank, Marikina City23OB0409Flood control100%June 20, 2024March 9, 2024—completedsumbong source
Improvement Works Along Upper Marikina River at Sta. 15 + 850 to Sta. 16 + 000, Right Bank, Marikina City23OB0410Flood control100%June 20, 2024March 4, 2024—completedsumbong source
River Improvement along Nangka River Phase 1, Nangka River, Marikina City23OB0237Flood control100%March 6, 2024March 6, 2024—completedsumbong source
Bank Improvement of Slope Protection along Marikina River (Package 6), Pasig City23OB0102100%July 3, 2024June 3, 2024—completedsumbong source
Bank Improvement of Slope Protection along Marikina River (Package 7), Pasig City23OB0103100%February 18, 2025February 18, 2025—completedsumbong source
Construction of Poblacion-Macaiban Dike, Santa Maria, Bulacan (Phase I)23CD0119100%March 31, 2024March 31, 2024—completedsumbong source
Construction of Riverbank Protection along Angat River Brgy. Tarcan Baliuag, Bulacan22CC0290100%September 1, 2022September 1, 2022—completedsumbong source
Construction of Riverbank Protection along Angat River Culianin to Cambaog, Plaridel, Bulacan22CC0269100%November 29, 2022November 29, 2022—completedsumbong source
Construction of Riverbank Protection along Bocaue River Brgy. Taal Bocaue, Bulacan22CC0213100%January 28, 2023January 27, 2023—completedsumbong source
Construction of Riverbank Protection Structure (Phase II) at Barangay San Roque, Baliuag, Bulacan24CC0023100%November 2, 2024November 1, 2024—completedsumbong source
Construction of Riverbank Protection Structure at Barangay Piel, Baliuag, Bulacan24CC0040100%November 2, 2024September 30, 2024—completedsumbong source
Construction of Riverbank Protection Structure at Barangay San Roque, Baliuag, Bulacan24CC0030100%November 2, 2024November 2, 2024—completedsumbong source
Construction of Slope Protection Structure, Barangay Kaypian, San Jose del Monte City, Bulacan24CD0058100%December 13, 2024December 13, 2024—completedsumbong source
Rehabilitation of Flood Mitigation Structure along Buli Creek, Pasig City24OB0100100%February 24, 2025February 24, 2025—completedsumbong source

Rule Definition

Active project count and total value vs peer 95th percentile.

Triggering Data & citations

Contractor carries far more concurrent flood-control value than peers

{
  "contractor": "M3 KONSTRACT CORP FORMERLY:MARGARITA CONST",
  "projectCount": 38,
  "totalValuePhp": 3067649627.9799995,
  "peerP95TotalPhp": 1014143494.4100002,
  "activeProjectCount": 0,
  "simultaneousThreshold": 25
}

Possible Innocent Explanations

  • Large national firm with many concurrent government clients
  • Data groups joint ventures under one name