Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 3 contracts awarded to BELL CONST by the same office started within 7 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 3 in the same municipality. It is common for large infrastructure programs to be split into multiple contracts for different sites or phases within a city.

Public record entityConstruction of Flood Control Structure, Binayoyo (Downstream) Phase 3, Barangay Calawis, Antipolo City
LocationCITY OF ANTIPOLO (RIZAL), RIZAL, Region IV-AContract 23DN0034
Amount₱48,999,997.09 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure, Binayoyo (Downstream) Phase 3, Barangay Calawis, Antipolo City23DN0034Flood control100%November 15, 2023September 24, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 21, 2023 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Rizal 1st District Engineering Office",
  "contractId": "23DN0034",
  "contractor": "BELL CONST",
  "windowDays": 120,
  "clusterSize": 3,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48999997.09,
  "averageTitleSimilarity": 0.908597975791964
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)RizalCity of AntipoloCalawis
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Active fault10.1 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)mediumUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeno layer coverage for this provinceUP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.