Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23HK0091 was awarded at 100.00% of its ABC. Across its 19 recorded contracts, PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS was awarded at ≥99.5% of ABC 19 times (100.0%), versus 70.4% for flood-control contracts overall. This may be due to highly competitive bidding where the winning bid matches the ABC exactly.

Public record entityFlood Management Program - Rehabilitation of Bio-os River Control, Amlan, Negros Oriental
LocationAMLAN (AYUQUITAN) (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VIIContract 23HK0091
Amount₱49,000,000.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Flood Management Program - Rehabilitation of Bio-os River Control, Amlan, Negros Oriental23HK0091Flood control100%January 21, 2024January 21, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 11, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Negros Oriental 2nd District Engineering Office",
  "ratio": 1,
  "abcPhp": 49000000,
  "threshold": 0.995,
  "contractId": "23HK0091",
  "contractor": "PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS",
  "contractCostPhp": 49000000
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to highly competitive bidding where the winning bid matches the ABC exactly.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalAmlanBio-os
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active fault12.9 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA1 (2.01-3 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.