Rehabilitation / Major Repair of Flood Control Structure23HK0091

Flood Management Program - Rehabilitation of Bio-os River Control, Amlan, Negros Oriental

Flood Management Program - Rehabilitation of Bio-os River Control, Amlan, Negros Oriental is a DPWH-tracked public work in AMLAN (AYUQUITAN) (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VII. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS. Figures trace to sumbong.

AMLAN (AYUQUITAN) (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱50,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23HK0091 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-07-25 → 2015-07-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Negros Oriental

Based on the coordinates published with the DPWH record and NOAH file NegrosOriental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Flood Management Program - Rehabilitation of Bio-os River Control, Amlan, Negros Oriental

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Flood Management Program - Rehabilitation of Bio-os River Control, Amlan, Negros Oriental
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Negros Oriental 2nd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

276 projects · ₱11.8B total · 28 flags

Other projects by this contractor

No sat.

CSSP, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, REHAB./ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG BAIS-KABANKALAN RD - K0070+000 - K0071+000, K0075 + 459 - K0076 + 598, K0087+000-K0088+054, K0090+00-K0091+000,

Region VII, Region VII

2024₱253.4M
Past target date (DPWH On-Going)
No sat.

IMPROVEMENT/WIDENING OF DUMAGUETE SOUTH RD INCLUDING RROW (S00275NR), K0011+360 - K0012+277.46; K0012+310 - K0016+340, BACONG, NEGROS ORIENTAL

Negros Oriental 3rd DEO, Negros Island Region

2017₱152.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SEAWALL, BARANGAY NORTH POBLACION, JIMALALUD, NEGROS ORIENTAL

Negros Island Region, Negros Island Region

2025₱149.6M
Past target date (DPWH On-Going)
No sat.

IMPROVEMENT/ WIDENING OF METRO DUMAGUETE DIVERSION ROAD INCL. RROW, DUMAGUETE CITY, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2017₱146.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS DUMAGUETE NORTH RD-K0025+000-K0025+223, K0025+238-K0026+000, K0027+598-K0028+740, NEGROS ORIENTAL PROVINCE

Region VII, Region VII

2020₱144.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE : SECONDARY ROADS: STA. CATALINA-PAMPLONA-TANJAY CITY - K0067 + 500 - K0072 + 000, STA. CATALINA, NEGROS ORIENTAL

Negros Oriental 3rd DEO, Negros Island Region

2025₱144.6M
Past target date (DPWH On-Going)
View all 276 projects →

4. Implementation

Contract Amount

₱49,000,000.00

Progress

Reported complete (DPWH)

Start Date

April 11, 2023

Target End

January 21, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalAmlanBio-os
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.