Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 21G00034 was awarded at 100.00% of its ABC. Across its 16 recorded contracts, A C RIVERO DEVELOPMENT CORP was awarded at ≥99.5% of ABC 16 times (100.0%), versus 70.4% for flood-control contracts overall. It is possible the contractor simply bid the maximum allowed amount to maximize revenue within legal limits.

Public record entityConstruction of Flood Control Structures at Patun-an River, Abut "A" (Upstream) along Bacolod North Road (S00408NR), Calatrava, Negros Occidental
LocationNEGROS OCCIDENTAL, Region VIContract 21G00034
Amount₱79,106,840.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structures at Patun-an River, Abut "A" (Upstream) along Bacolod North Road (S00408NR), Calatrava, Negros Occidental21G00034Flood control100%August 2, 2022August 2, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 19, 2021 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Negros Occidental 5th District Engineering Office",
  "ratio": 1,
  "abcPhp": 79106840,
  "threshold": 0.995,
  "contractId": "21G00034",
  "contractor": "A C RIVERO DEVELOPMENT CORP",
  "contractCostPhp": 79106840
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OccidentalCalatravaPatun-an
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025Bualoi 2025
Hazard exposure
Active fault4.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA1 (2.01-3 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.