Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: Cebu 1st District Engineering Office awarded 38 of 40 recorded flood-control contracts (95.0%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (24.6 percentage points higher; binomial p = 1.2e-04), across 15 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This may be due to consistently competitive bidding or standard pricing practices in the district.

Public record entityData not yet available
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Cebu 1st District Engineering Office: contracts

38 of 40 contracts (95%) at ≥99.5% of ABC · peer baseline 70.4% · gap +24.6 pts · binomial p = 1.2e-4. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).

ContractTitleContractor% of ABCSource
21HE0157Construction of San Isidro River Flood Control Structure, San Fernando, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST100.00%DPWH
23HE0091Construction of Drainage along N Bacalso Ave, K0017 + 260 - K0017 + 680 (Leftside); K0018 + 080 - K0018 + 980 (Leftside); K0018 + 980 - K0019 + 380 (Bothside), ARQ BUILDERS / 647 CONST AND DEVELOPMENT CORP100.00%DPWH
24HE0052Construction of Flood Control along Mananga River (Right Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 3)QM BUILDERS100.00%DPWH
22HE0066Construction of Seawall, Brgy. Poblacion, Talisay City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST100.00%DPWH
24HE0053Construction of Flood Control along Mananga River (Left Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 3)QM BUILDERS100.00%DPWH
24HE0167Construction of Revetment Wall Structure along Mananga River (Right Side), Sitio Bogo, Barangay Camp 4, Talisay City, CebuQM BUILDERS100.00%DPWH
23HE0144Construction of Flood Control Structure along Mananga River (Right Side) at Sitio Luyongan, Barangay Lagtang, Talisay City, CebuQM BUILDERS100.00%DPWH
24HE0051Construction of Flood Control along Mananga River (Right Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 2)QM BUILDERS100.00%DPWH
24HE0054Construction of Flood Control along Mananga River (Left Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 4)QM BUILDERS100.00%DPWH
23HE0141Construction of Flood Control Structure along Mananga River (Left Side) at Sitio Ibo, Barangay Lagtang, Talisay City, CebuQM BUILDERS100.00%DPWH
22HE0068Construction of Seawall, Brgy. Tangke, Talisay City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST100.00%DPWH
22H00041Construction of Flood Mitigation Structure along Mananga River (Upper Side), Talisay City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST100.00%DPWH
21HE0156Construction of Tina-An River Flood Control Structure, Naga City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST100.00%DPWH
24HE0169Construction of Revetment Wall along Mananga River (Left Side) at Sitio Luyungan (Upstream), Package 1, Barangay Lagtang, Talisay City, CebuQM BUILDERS100.00%DPWH
23HE0143Construction of Flood Control Structure along Mananga River (Right Side) at Sitio Ibo, Barangay Lagtang, Talisay City, CebuQM BUILDERS100.00%DPWH
24HE0055Construction of Ocaña River Flood Control Structure, Carcar City, CebuQM BUILDERS / AR ADLAWAN CONST100.00%DPWH
23HE0142Construction of Flood Control Structure along Mananga River (Left Side) at Sitio Luyongan, Barangay Lagtang, Talisay City, CebuQM BUILDERS100.00%DPWH
22HE0033Construction of Flood Control Structure, Mananga River, Sta. 0+000 - Sta. 0+331 (both side), Talisay City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST100.00%DPWH
24HE0166Construction of Revetment Wall Structure along Mananga River (Left Side), Sitio Bogo, Barangay Camp 4, Talisay City, CebuQM BUILDERS100.00%DPWH
24HE0164Construction of Revetment Wall Structure along Mananga River (Right Side), Purok Narra, Barangay Jaclupan, Talisay City, CebuQM BUILDERS100.00%DPWH
21HE0158Construction of Valladolid River Flood Control Structure, Carcar City, CebuWERR CORP INTERNATIONAL / PRIME GIGABUILD CONST CORP FORMERLY: RON DANIELL CONST CORP100.00%DPWH
24HE0163Construction of flood control structure along Mananga River (Right side), Sitio Kimawa, Barangay Jaclupan, Talisay City, CebuQM BUILDERS100.00%DPWH
22HE0034Construction of Flood Mitigation Structure, Abuno River, Sta. 0+000.00 - Sta. 0+537.00, Minglanilla, CebuPRIME GIGABUILD CONST CORP FORMERLY: RON DANIELL CONST CORP100.00%DPWH
22HE0035Construction of Mananga River Flood Control Structure, Talisay City, CebuW GO CONST AND SUPPLY / WTG CONST & DEVELOPMENT CORP100.00%DPWH
22HE0067Construction of Seawall, Brgy. Cansojong, Talisay City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST100.00%DPWH
22HE0032Construction of Carcar River Flood Control Structure, Poblacion I, Sta. 0+000.00 - Sta. 0+504.00, Carcar City, CebuPRIME GIGABUILD CONST CORP FORMERLY: RON DANIELL CONST CORP100.00%DPWH
23HE0110Construction of Lamacan River Flood Control Structure (Downstream), Sta. 0 + 000 - Sta. 0 + 230 (Leftside), Sta. 0 + 000 - Sta. 0 + 230 (Rightside), Sibonga, CeQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST100.00%DPWH
23HE0097Construction of Mananga River Flood Control Structure, Talisay City, CebuQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.98%DPWH
23HE0094Construction of Seawall protecting Regional Mobile Force Batallion 7 at Camp Cederino Genovia, Barangay Bahay, Sibonga, CebuJANUARY BUILDERS99.97%DPWH
23HE0133Construction of Mainit River Flood Control Structure, Naga City, CebuJANUARY BUILDERS99.97%DPWH
24HE0056Construction of Lutac River Flood Control Structure, Naga City, CebuQM BUILDERS / JANUARY BUILDERS99.96%DPWH
24HE0059Construction of Mainit River Flood Control Structure, Naga City, CebuQM BUILDERS / JANUARY BUILDERS99.95%DPWH
24HE0159Construction of Flood Control Structures at Brgy Lanas, Naga City, Cebu (Package 2) Right SideQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.90%DPWH
24HE0160Construction of Flood Control Structures at Brgy Lanas, Naga City, Cebu (Package 1) Left SideQUIRANTE CONST CORP FORMERLY: QUIRANTE CONST99.89%DPWH
24HE0066Construction of Drainage Brgy. Calajo-an, Municipality of Minglanilla, CebuCARCEL CONST AND DEVELOPMENT CORP99.80%DPWH
23HE0005Construction of Flood Control, Tabunok, Talisay City, CebuPLANAC CONST99.80%DPWH
23HE0092Construction of Drainage System along N Bacalso Ave, Minglanilla, CebuAR ADLAWAN CONST99.80%DPWH
24HE0158Construction of Abuno River Flood Control Structure, Naga City, CebuLCTING CONST AND DEVELOPMENT CORP FORMERLY: L C TING CONST99.63%DPWH
24HE0050Improvement of Canasujan SRIS Drainage Canal, Carcar, CebuA T DUMLAO CONST INC FORMERLYANDONI T D99.07%DPWH
23HE0093Construction of Drainage System along Sibonga-Dumanjug Road, K0051 + (-450) - K0051 + (-050), Sibonga, Cebu647 CONST AND DEVELOPMENT CORP98.98%DPWH

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Completion schedule is shown for project and contractor flags only.

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Implementing office awards near-ABC contracts far more often than the flood-control baseline

{
  "office": "Cebu 1st District Engineering Office",
  "nearAbc": 38,
  "trigger": "office_pattern_aggregate",
  "officeId": "4abdfdaa-c375-517f-8d11-7fee0c94ac53",
  "threshold": 0.995,
  "binomialTailP": 0.00012456219700712884,
  "nearAbcRatePct": 95,
  "totalContracts": 40,
  "baselineRatePct": 70.4,
  "excessPctPoints": 24.6,
  "expectedNearAbc": 28.2,
  "baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}

Possible Innocent Explanations

  • This may be due to consistently competitive bidding or standard pricing practices in the district.