Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Cebu 1st District Engineering Office awarded 38 of 40 recorded flood-control contracts (95.0%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (24.6 percentage points higher; binomial p = 1.2e-04), across 15 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This may be due to consistently competitive bidding or standard pricing practices in the district.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Cebu 1st District Engineering Office: contracts
38 of 40 contracts (95%) at ≥99.5% of ABC · peer baseline 70.4% · gap +24.6 pts · binomial p = 1.2e-4. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 21HE0157 | Construction of San Isidro River Flood Control Structure, San Fernando, Cebu | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 100.00% | DPWH |
| 23HE0091 | Construction of Drainage along N Bacalso Ave, K0017 + 260 - K0017 + 680 (Leftside); K0018 + 080 - K0018 + 980 (Leftside); K0018 + 980 - K0019 + 380 (Bothside), | ARQ BUILDERS / 647 CONST AND DEVELOPMENT CORP | 100.00% | DPWH |
| 24HE0052 | Construction of Flood Control along Mananga River (Right Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 3) | QM BUILDERS | 100.00% | DPWH |
| 22HE0066 | Construction of Seawall, Brgy. Poblacion, Talisay City, Cebu | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 100.00% | DPWH |
| 24HE0053 | Construction of Flood Control along Mananga River (Left Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 3) | QM BUILDERS | 100.00% | DPWH |
| 24HE0167 | Construction of Revetment Wall Structure along Mananga River (Right Side), Sitio Bogo, Barangay Camp 4, Talisay City, Cebu | QM BUILDERS | 100.00% | DPWH |
| 23HE0144 | Construction of Flood Control Structure along Mananga River (Right Side) at Sitio Luyongan, Barangay Lagtang, Talisay City, Cebu | QM BUILDERS | 100.00% | DPWH |
| 24HE0051 | Construction of Flood Control along Mananga River (Right Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 2) | QM BUILDERS | 100.00% | DPWH |
| 24HE0054 | Construction of Flood Control along Mananga River (Left Side) at Sitio Tigib, Barangay Lagtang, Talisay City, Cebu (Package 4) | QM BUILDERS | 100.00% | DPWH |
| 23HE0141 | Construction of Flood Control Structure along Mananga River (Left Side) at Sitio Ibo, Barangay Lagtang, Talisay City, Cebu | QM BUILDERS | 100.00% | DPWH |
| 22HE0068 | Construction of Seawall, Brgy. Tangke, Talisay City, Cebu | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 100.00% | DPWH |
| 22H00041 | Construction of Flood Mitigation Structure along Mananga River (Upper Side), Talisay City, Cebu | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 100.00% | DPWH |
| 21HE0156 | Construction of Tina-An River Flood Control Structure, Naga City, Cebu | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 100.00% | DPWH |
| 24HE0169 | Construction of Revetment Wall along Mananga River (Left Side) at Sitio Luyungan (Upstream), Package 1, Barangay Lagtang, Talisay City, Cebu | QM BUILDERS | 100.00% | DPWH |
| 23HE0143 | Construction of Flood Control Structure along Mananga River (Right Side) at Sitio Ibo, Barangay Lagtang, Talisay City, Cebu | QM BUILDERS | 100.00% | DPWH |
| 24HE0055 | Construction of Ocaña River Flood Control Structure, Carcar City, Cebu | QM BUILDERS / AR ADLAWAN CONST | 100.00% | DPWH |
| 23HE0142 | Construction of Flood Control Structure along Mananga River (Left Side) at Sitio Luyongan, Barangay Lagtang, Talisay City, Cebu | QM BUILDERS | 100.00% | DPWH |
| 22HE0033 | Construction of Flood Control Structure, Mananga River, Sta. 0+000 - Sta. 0+331 (both side), Talisay City, Cebu | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 100.00% | DPWH |
| 24HE0166 | Construction of Revetment Wall Structure along Mananga River (Left Side), Sitio Bogo, Barangay Camp 4, Talisay City, Cebu | QM BUILDERS | 100.00% | DPWH |
| 24HE0164 | Construction of Revetment Wall Structure along Mananga River (Right Side), Purok Narra, Barangay Jaclupan, Talisay City, Cebu | QM BUILDERS | 100.00% | DPWH |
| 21HE0158 | Construction of Valladolid River Flood Control Structure, Carcar City, Cebu | WERR CORP INTERNATIONAL / PRIME GIGABUILD CONST CORP FORMERLY: RON DANIELL CONST CORP | 100.00% | DPWH |
| 24HE0163 | Construction of flood control structure along Mananga River (Right side), Sitio Kimawa, Barangay Jaclupan, Talisay City, Cebu | QM BUILDERS | 100.00% | DPWH |
| 22HE0034 | Construction of Flood Mitigation Structure, Abuno River, Sta. 0+000.00 - Sta. 0+537.00, Minglanilla, Cebu | PRIME GIGABUILD CONST CORP FORMERLY: RON DANIELL CONST CORP | 100.00% | DPWH |
| 22HE0035 | Construction of Mananga River Flood Control Structure, Talisay City, Cebu | W GO CONST AND SUPPLY / WTG CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 22HE0067 | Construction of Seawall, Brgy. Cansojong, Talisay City, Cebu | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 100.00% | DPWH |
| 22HE0032 | Construction of Carcar River Flood Control Structure, Poblacion I, Sta. 0+000.00 - Sta. 0+504.00, Carcar City, Cebu | PRIME GIGABUILD CONST CORP FORMERLY: RON DANIELL CONST CORP | 100.00% | DPWH |
| 23HE0110 | Construction of Lamacan River Flood Control Structure (Downstream), Sta. 0 + 000 - Sta. 0 + 230 (Leftside), Sta. 0 + 000 - Sta. 0 + 230 (Rightside), Sibonga, Ce | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 100.00% | DPWH |
| 23HE0097 | Construction of Mananga River Flood Control Structure, Talisay City, Cebu | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 99.98% | DPWH |
| 23HE0094 | Construction of Seawall protecting Regional Mobile Force Batallion 7 at Camp Cederino Genovia, Barangay Bahay, Sibonga, Cebu | JANUARY BUILDERS | 99.97% | DPWH |
| 23HE0133 | Construction of Mainit River Flood Control Structure, Naga City, Cebu | JANUARY BUILDERS | 99.97% | DPWH |
| 24HE0056 | Construction of Lutac River Flood Control Structure, Naga City, Cebu | QM BUILDERS / JANUARY BUILDERS | 99.96% | DPWH |
| 24HE0059 | Construction of Mainit River Flood Control Structure, Naga City, Cebu | QM BUILDERS / JANUARY BUILDERS | 99.95% | DPWH |
| 24HE0159 | Construction of Flood Control Structures at Brgy Lanas, Naga City, Cebu (Package 2) Right Side | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 99.90% | DPWH |
| 24HE0160 | Construction of Flood Control Structures at Brgy Lanas, Naga City, Cebu (Package 1) Left Side | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 99.89% | DPWH |
| 24HE0066 | Construction of Drainage Brgy. Calajo-an, Municipality of Minglanilla, Cebu | CARCEL CONST AND DEVELOPMENT CORP | 99.80% | DPWH |
| 23HE0005 | Construction of Flood Control, Tabunok, Talisay City, Cebu | PLANAC CONST | 99.80% | DPWH |
| 23HE0092 | Construction of Drainage System along N Bacalso Ave, Minglanilla, Cebu | AR ADLAWAN CONST | 99.80% | DPWH |
| 24HE0158 | Construction of Abuno River Flood Control Structure, Naga City, Cebu | LCTING CONST AND DEVELOPMENT CORP FORMERLY: L C TING CONST | 99.63% | DPWH |
| 24HE0050 | Improvement of Canasujan SRIS Drainage Canal, Carcar, Cebu | A T DUMLAO CONST INC FORMERLYANDONI T D | 99.07% | DPWH |
| 23HE0093 | Construction of Drainage System along Sibonga-Dumanjug Road, K0051 + (-450) - K0051 + (-050), Sibonga, Cebu | 647 CONST AND DEVELOPMENT CORP | 98.98% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Cebu 1st District Engineering Office",
"nearAbc": 38,
"trigger": "office_pattern_aggregate",
"officeId": "4abdfdaa-c375-517f-8d11-7fee0c94ac53",
"threshold": 0.995,
"binomialTailP": 0.00012456219700712884,
"nearAbcRatePct": 95,
"totalContracts": 40,
"baselineRatePct": 70.4,
"excessPctPoints": 24.6,
"expectedNearAbc": 28.2,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents
Possible Innocent Explanations
- This may be due to consistently competitive bidding or standard pricing practices in the district.