Construction of Lamacan River Flood Control Structure (Downstream), Sta. 0 + 000 - Sta. 0 + 230 (Leftside), Sta. 0 + 000 - Sta. 0 + 230 (Rightside), Sibonga, Cebu
Construction of Lamacan River Flood Control Structure (Downstream), Sta. 0 + 000 - Sta. 0 + 230 (Leftside), Sta. 0 + 000 - Sta. 0 + 230 (Rightside), Sibonga, Cebu is a DPWH-tracked public work in SIBONGA (CEBU), CEBU, Region VII. Reported contract value: ₱91,674,113.00. Status: Reported complete (DPWH). Contractor on record: QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST. Figures trace to sumbong.
Total Contract Cost
