Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23CD0063 and 22CD0005 have near-identical descriptions about 2184 m apart (funding years 2022, 2023; ₱96.50M, ₱94.07M). Worth checking whether they cover the same works. It is possible that these are sequential phases or extensions of the same flood control project funded in different years.

Public record entityConstruction of Flood Control Structures, along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road Sto. Cristo River, San Jose Del Monte City, Bulacan
LocationCITY OF SAN JOSE DEL MONTE (BULACAN), BULACAN, Region IIIContract 22CD0005
Amount₱94,070,857.03 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structures, along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road Sto. Cristo River, San Jose Del Monte City, Bulacan22CD0005Flood control100%December 11, 2022December 11, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: March 7, 2022 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "22CD0005",
  "coordinates": {
    "lat": 14.8302,
    "lon": 121.04233
  },
  "municipality": "CITY OF SAN JOSE DEL MONTE (BULACAN)",
  "distanceMeters": 2184.144061437546,
  "titleSimilarity": 0.99644128113879
}

Cite this record

Love the Philippines. “Duplicate or Near-Duplicate Projects (C3): Construction of Flood Control Structures, along NCR/ Bulacan Bdry. - Bigte - Ipo Dam Road Sto. Cristo River, San Jose Del Monte City, Bulacan.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/60efe08c-1967-4813-8640-b81359e79f22

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanCity of San Jose Del MonteSapang Palay
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Active fault11.3 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)LandslidemediumUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.