Duplicate or Near-Duplicate Projects
Very similar descriptions within ~100m or identical coordinates across contracts/years.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contracts 23GB0050 and 22GB0013 have near-identical descriptions about 2893 m apart (funding years 2022, 2023; ₱33.76M, ₱1.69M). Worth checking whether they cover the same works. It is possible that these are sequential phases or extensions of the same flood control project, but the titles do not specify this.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Control Structure along Sibalom River, Barangay Bongsod, Sibalom, Antique23GB0050Flood control | 100% | December 20, 2023 | December 9, 2023 | — | completedsumbong source |
Start: April 11, 2023 · Source fetched October 21, 2026
Rule Definition
Title similarity + distance or shared coordinates within municipality.
Triggering Data & citations
Similar project description near another contract in the same municipality
{
"contractId": "23GB0050",
"coordinates": {
"lat": 10.806591,
"lon": 121.984085
},
"municipality": "SIBALOM (ANTIQUE)",
"distanceMeters": 2892.682304991302,
"titleSimilarity": 1
}Source documents
