Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Pattern Consistent with Contract Splitting

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 4 contracts awarded to ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST by the same office started within 9 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 4 in the same municipality. It is common for large riverwall or flood mitigation projects to be split into phases or cover multiple sites within a city for logistical or budgetary reasons.

Public record entityConstruction of Flood Mitigation Structure, Dampalit Riverwall (Phase 8), Barangay Dampalit, Malabon City
LocationCITY OF MALABON (METROPOLITAN MANILA), MALABON CITY, National Capital RegionContract 24OA0033
Amount₱48,998,274.82 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure, Dampalit Riverwall (Phase 8), Barangay Dampalit, Malabon City24OA0033Flood control100%October 8, 2024October 8, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 12, 2024 · Source fetched October 21, 2026

Rule Definition

≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "Malabon-Navotas District Engineering Office",
  "contractId": "24OA0033",
  "contractor": "ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST",
  "windowDays": 120,
  "clusterSize": 4,
  "thresholdPhp": 50000000,
  "contractCostPhp": 48998274.82,
  "averageTitleSimilarity": 0.8750888580534641
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of MalabonDampalit
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Active fault18.2 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)mediumUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA1 (2.01-3 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.