Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Schedule / Date Inconsistencies

Completion before start, implausible duration for cost, or future dates marked complete.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23CC0063 (₱29.40M) is recorded as completed in 71 days against 209 planned; similar-cost projects take a median of 239 days, putting it in the fastest 2.1%. The contractor may have deployed extra resources or worked overtime to finish ahead of schedule.

Public record entityConstruction of River Control Project along Angat River, Lumang Bayan Section, Sta. 03+190 to Sta. 03+340, Plaridel, Bulacan
LocationPLARIDEL (BULACAN), BULACAN, Region IIIContract 23CC0063
Amount₱29,399,001.49 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of River Control Project along Angat River, Lumang Bayan Section, Sta. 03+190 to Sta. 03+340, Plaridel, Bulacan23CC0063Flood control100%September 3, 2023April 18, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 6, 2023 · Source fetched October 21, 2026

Rule Definition

Compares start, target, and actual dates from Sumbong with contract cost.

Triggering Data & citations

Contract schedule fields are inconsistent or implausible

{
  "issues": [
    "implausibly_short_duration"
  ],
  "startDate": "2023-02-06T00:00:00.000Z",
  "contractId": "23CC0063",
  "actualEndDate": "2023-04-18T00:00:00.000Z",
  "targetEndDate": "2023-09-02T00:00:00.000Z",
  "contractCostPhp": 29399001.49
}

Possible Innocent Explanations

  • Revised dates not yet reflected in Sumbong export
  • Early completion certificate vs planned start typo

Cite this record

Love the Philippines. “Schedule / Date Inconsistencies (C4): Construction of River Control Project along Angat River, Lumang Bayan Section, Sta. 03+190 to Sta. 03+340, Plaridel, Bulacan.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/6b9d79f0-9b74-4193-ad70-7a8aa319090f

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanPlaridelLumang Bayan
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Active fault32.4 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.