Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22OA0074 lists a cost of ₱21.78M, 1.05% above its Approved Budget for the Contract of ₱21.55M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a data entry error or a post-award contract variation.

Public record entityConstruction of Pumping Station, Barangay Tañong, Malabon City
LocationCITY OF MALABON (METROPOLITAN MANILA), MALABON CITY, National Capital RegionContract 22OA0074
Amount₱21,779,964.74101.05% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Pumping Station, Barangay Tañong, Malabon City22OA0074Flood control100%October 25, 2022October 25, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 28, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Malabon-Navotas District Engineering Office",
  "ratio": 1.0104516706330668,
  "abcPhp": 21554682.3,
  "threshold": 0.995,
  "contractId": "22OA0074",
  "contractor": "AL-REM KONSTRUCT INC",
  "contractCostPhp": 21779964.74
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to a data entry error or a post-award contract variation.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of Navotas
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Active fault14.1 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)mediumUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA1 (2.01-3 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.