Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22CN0036 and 22C00094 have near-identical descriptions about 3089 m apart (funding year 2022; ₱49.00M, ₱48.15M). Worth checking whether they cover the same works. It is possible these are separate segments of a larger river improvement project awarded to different contractors.

Public record entityConstruction of Flood Mitigation Structure and Drainage System, Diteki-Aguang River Improvement Project, Baler and San Luis, Aurora
LocationSAN LUIS (AURORA), AURORA, Region IIIContract 22C00094
Amount₱48,146,608.28 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure and Drainage System, Diteki-Aguang River Improvement Project, Baler and San Luis, Aurora22C00094Flood control100%May 8, 2023May 8, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: August 15, 2022 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "22C00094",
  "coordinates": {
    "lat": 15.762861,
    "lon": 121.52167
  },
  "municipality": "SAN LUIS (AURORA)",
  "distanceMeters": 3088.827941480319,
  "titleSimilarity": 1
}

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)AuroraBalerCalabuanan
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Mitag 2025Kajiki 2025
Hazard exposure
Active fault10.4 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.