Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: contract 24OA0036 lists a cost of ₱49.00M, 0.11% above its Approved Budget for the Contract of ₱48.95M. Under RA 9184, awards normally may not exceed the ABC. This may be due to a rounding or data entry error.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Flood Mitigation Structure, Muzon Riverwall (Phase 3), Barangay Muzon, Malabon City24OA0036Flood control | 100% | December 7, 2024 | December 6, 2024 | — | completedsumbong source |
Start: February 12, 2024 · Source fetched October 21, 2026
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Contract cost is at or above 99.5% of approved budget for contract (ABC)
{
"deo": "Malabon-Navotas District Engineering Office",
"ratio": 1.0010813098046933,
"abcPhp": 48947073.05,
"threshold": 0.995,
"contractId": "24OA0036",
"contractor": "M S RAMOS CONST INC FORMERLY: M S RAMOS",
"contractCostPhp": 49000000
}Source documents
Possible Innocent Explanations
- Accurate cost estimating
- Single qualified bid at market rate
- ABC set equal to engineer’s estimate
- This may be due to a rounding or data entry error.