Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23GK0054 was awarded at 100.00% of its ABC. Across its 115 recorded contracts, LEGACY CONST CORP FORMERLY: LEGACY CONST was awarded at ≥99.5% of ABC 100 times (87.0%), versus 70.4% for flood-control contracts overall. This may be due to highly competitive bidding or precise cost estimation.

Public record entityRehabilitation of Flood Control Structure along Malihaw River (Phase I), Barangay VI-A and Barangay IX,Victorias City, Negros Occidental
LocationCITY OF VICTORIAS (NEGROS OCCIDENTAL), NEGROS OCCIDENTAL, Region VIContract 23GK0054
Amount₱86,847,967.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Rehabilitation of Flood Control Structure along Malihaw River (Phase I), Barangay VI-A and Barangay IX,Victorias City, Negros Occidental23GK0054Flood control100%November 24, 2023November 24, 2023—completedsumbong source

Start: February 14, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Negros Occidental 1st District Engineering Office",
  "ratio": 0.9999767494494151,
  "abcPhp": 86849986.31,
  "threshold": 0.995,
  "contractId": "23GK0054",
  "contractor": "LEGACY CONST CORP FORMERLY: LEGACY CONST",
  "contractCostPhp": 86847967
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to highly competitive bidding or precise cost estimation.