Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23CC0383 and 24CC0140 have near-identical descriptions about 539 m apart (funding years 2023, 2024; ₱49.00M, ₱67.55M). Worth checking whether they cover the same works. The second project may be a continuation or expansion of the first, but the lack of a phase label makes this unclear.

Public record entityConstruction of Flood Mitigation Structure at barangay Frances (Phase II), Calumpit, Bulacan
LocationCALUMPIT (BULACAN), BULACAN, Region IIIContract 23CC0383
Amount₱48,999,979.80 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Mitigation Structure at barangay Frances (Phase II), Calumpit, Bulacan23CC0383Flood control100%November 28, 2023August 31, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 3, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23CC0383",
  "coordinates": {
    "lat": 14.915,
    "lon": 120.75278
  },
  "municipality": "CALUMPIT (BULACAN)",
  "distanceMeters": 538.6717592220639,
  "titleSimilarity": 0.9171974522292994
}

Cite this record

Love the Philippines. “Duplicate or Near-Duplicate Projects (C3): Construction of Flood Mitigation Structure at barangay Frances (Phase II), Calumpit, Bulacan.” Source: sumbong. Data as of October 21, 2026. https://lovethephilippines.com/risk/79ad6c97-1963-4442-bece-5e54aa64dc9b

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanCalumpitFrances
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Active fault43.6 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.