Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 22GP0046 was awarded at 100.00% of its ABC. Across its 22 recorded contracts, IBC INTERNATIONAL BUILDERS CORP was awarded at ≥99.5% of ABC 21 times (95.5%), versus 70.4% for flood-control contracts overall. This may be due to precise cost estimation or competitive bidding that exactly matched the ABC.

Public record entityConstruction of River Control along Panay River Basin, Brgy. Dolores, Dumalag, Capiz
LocationDUMALAG (CAPIZ), CAPIZ, Region VIContract 22GP0046
Amount₱42,627,858.00100.00% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of River Control along Panay River Basin, Brgy. Dolores, Dumalag, Capiz22GP0046Flood control100%November 28, 2023November 28, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 15, 2022 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Capiz 2nd District Engineering Office",
  "ratio": 0.9999998031803908,
  "abcPhp": 42627866.39,
  "threshold": 0.995,
  "contractId": "22GP0046",
  "contractor": "IBC INTERNATIONAL BUILDERS CORP",
  "contractCostPhp": 42627858
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate
  • This may be due to precise cost estimation or competitive bidding that exactly matched the ABC.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)CapizDumalagDolores
Storms whose wind field reached it
Koto 2025Kalmaegi 2025Bualoi 2025
Hazard exposure
Active fault35.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)LandslidehighUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.