Schedule / Date Inconsistencies

Completion before start, implausible duration for cost, or future dates marked complete.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 24CC0264 (₱72.37M) is recorded as completed in 70 days against 239 planned; similar-cost projects take a median of 285 days, putting it in the fastest 1.6%. The contractor may have deployed extra resources or worked overtime to finish ahead of schedule.

Public record entityConstruction of Reinforced Concrete Flood Control Structure, Barangay Atlag, Malolos City, Bulacan
LocationCITY OF MALOLOS (CAPITAL) (BULACAN), BULACAN, Region IIIContract 24CC0264
Amount₱72,374,953.65 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Reinforced Concrete Flood Control Structure, Barangay Atlag, Malolos City, Bulacan24CC0264Flood control100%November 27, 2024June 11, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: April 2, 2024 · Source fetched October 21, 2026

Rule Definition

Compares start, target, and actual dates from Sumbong with contract cost.

Triggering Data & citations

Contract schedule fields are inconsistent or implausible

{
  "issues": [
    "implausibly_short_duration"
  ],
  "startDate": "2024-04-02T00:00:00.000Z",
  "contractId": "24CC0264",
  "actualEndDate": "2024-06-11T00:00:00.000Z",
  "targetEndDate": "2024-11-26T00:00:00.000Z",
  "contractCostPhp": 72374953.65
}

Possible Innocent Explanations

  • Revised dates not yet reflected in Sumbong export
  • Early completion certificate vs planned start typo

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanCity of MalolosSanto Cristo
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Man-Yi 2024Trami 2024
Hazard exposure
Active fault34.6 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.